24 September 2026

Download Screen Reader

Accessibility Options

Font Size

Visual Features

Text Features

Content Features

Screen Reader

हिमाचल प्रदेश विद्युत नियामक आयोग

Himachal Pradesh Electricity Regulatory Commission

Before Hon’ble HPERC in the Matter of Filing of Aggregate Revenue Requirement (ARR) of State Load Despatch Centre for the MYT Control Period (FY12 – FY14) under section 32 and 86 of the Electricity Act, 2003