Before Hon’ble HPERC in the Matter of Approval of Capital Cost and Determination of Tariff for 3rd and 4th Control Period from COD to FY 2023-24 for 33/220kV, 80/100 MVA GIS Sub-Station at Phojal along with 220kV D/C LILO Transmission Line of HPPTCL
by hperc | Sep 10, 2024

