Capital Cost and Tariff determination of 400/220 kV, 315 MVA Pooling Sub-Station at Gumma (Asset-1), Additional 400/220 kV, 315 MVA Transformer Bank at Gumma (Asset-2), 220 kV Double Circuit Twin Moose Transmission Line from Hatkoti to Gumma along with LILO of 400 kV Double Circuit Jhakri to Abdullapur Transmission Line (Asset-3) and 220 kV Switching Station at Hatkoti (Asset-4)
by hperc | Jul 17, 2025