Before Hon’ble HPERC in the Matter of Approval of Capital Cost and determination of Tariff for the 4th and 5th Control Period from COD to FY 2028-29 for 220/132 kV, 2×80/100 MVA Substation at Mazra (Asset-1), 220 kV D/C Mazra-Karian Transmission Line (Asset-2) & LILO of 132 kV Kurthla-Bathri D/C line at 220/132 kV Mazra Substation (Asset-3)
by hperc | Jun 23, 2026

