हिमाचल प्रदेश विद्युत नियामक आयोग

Himachal Pradesh Electricity Regulatory Commission

Before Hon’ble HPERC in the Matter of Approval of Capital Cost and determination of Tariff for the 4th and 5th Control Period from COD to FY 2028-29 for 220/132 kV, 2×80/100 MVA Substation at Mazra (Asset-1), 220 kV D/C Mazra-Karian Transmission Line (Asset-2) & LILO of 132 kV Kurthla-Bathri D/C line at 220/132 kV Mazra Substation (Asset-3)