Before Hon’ble HPERC in the matter of Amendment In Model PPA (Approved in Case No. 2 / 2002) For SHEP Up To 5 MW Including 5 MW Capacity Being Executed By IPP in Private Sector in the State of Himachal Pradesh
Before Hon’ble HPERC in the matter of Amendment In Model PPA (Approved in Case No. 2 / 2002) For SHEP Up To 5 MW Including 5 MW Capacity Being Executed By IPP in Private Sector in the State of Himachal Pradesh