Before Hon’ble HPERC in the Matter of Approval of Capital Cost and determination of tariff for 4th Control Period from CoD to FY 2023-24 for 220 kV Snail-Hatkoti D/C Transmission Line
Before Hon’ble HPERC in the Matter of Approval of Capital Cost and determination of tariff for 4th Control Period from CoD to FY 2023-24 for 220 kV Snail-Hatkoti D/C Transmission Line