Before Hon’ble HPERC in the Matter of Approval of Capital Cost and Determination of Tariff for the 4th and 5th Control Period from COD to FY 2028-29 for 220/66 kV, 100/126 MVA (2×50/63 MVA) GIS Sub-Station in the yard of 400/220 kV GIS Sub-Station at Gumma
by hperc | Mar 5, 2026

