Before Hon’ble HPERC in the Matter of Approval of Capital Cost and determination of Tariff for the period from COD (20.05.2022) to FY 2023-24 for 66kV GIS Switching Sub-station at Urni (Asset-1) and for the period from COD (20.05.2022) to FY 2023-24 for 66kV D/C Line from Urni Switching Station to Wangtoo Sub-station (Asset-2) of HPPTCL
by hperc | Jun 12, 2024