Draft Order w.r.t Determination of Generic Levellised Tariffs for Solar PV Projects under 2nd control period for the last six months of FY 2019-20 (i.e. 1st October, 2019 to 31st March, 2020).
Draft Order w.r.t Determination of Generic Levellised Tariffs for Solar PV Projects under 2nd control period for the last six months of FY 2019-20 (i.e. 1st October, 2019 to 31st March, 2020).