All Orders

Keyword Tue, Jan 28th, 2025
Sr.No. Case No. Description Date Of Order
1 46/2021
Before Hon'ble HPERC in the Matter of M/s Everest Power Private Limited V/s HPPTCL23-01-2025
2 116/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and Determination of Tariff for 4th Control Period from CoD to FY 2023-24 for 66/22 kV Substation Nirmand (Bagipul) (Asset-1) and 66 kV D/C Nirmand–Kotla Transmission Line(Asset-2) of HPPTCL22-01-2025
3 30/2024
Multi Year Tariff Order For Himachal Pradesh Power Transmission Corporation Limited (HPPTCL) FY 2024-25 to FY 2028-29 for Approval of the Five-Year Business Plan and MYT Petition for the Fifth Control Period from FY 2024-25 to FY 2028-2922-01-2025
4 120/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s V.B. Hydro Projects Limited14-01-2025
5 135/2024
Before Hon'ble HPERC in the Matter of M/s Solding Hydrowatt Private Limited V/s HPSEB Ltd.14-01-2025
6 147/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Lanco Hydro Power Ltd. and M/s Engenrin Hydro Power Ltd14-01-2025
7 148/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Lanco Hydro Power Ltd and M/s Engenrin Hydro Power Ltd.14-01-2025
8 MA 172/2024
Before Hon'ble HPERC in the Matter of M/s Prime Steel Industries Pvt. Ltd. Versus the HPSEBL26-12-2024
9 152/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and the Dharnasi Solar Power Project26-12-2024
10 153/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Mahesh Solar Power Project26-12-2024
11 154/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s B.G. Energy Solar Power Project26-12-2024
12 149/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Nuclear Energy Corporation of India Limited26-12-2024
13 133/2024
Before Hon'ble HPERC in the Matter of M/s BS Farms Solar Venture Versus the HPSEBL26-12-2024
14 118/2024
Before Hon'ble HPERC in the Matter of M/s Sai Eternal Foundation V/s HPSEB Ltd.26-12-2024
15 36/2023
Before Hon'ble HPERC in the Matter of M/s Swadeshi Distributors LLP V/s The Directorate of Energy & Others26-12-2024
16 150/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Solar Energy Corporation of India Limited (SECI)17-12-2024
17 151/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Solar Energy Corporation of India Limited (SECI)17-12-2024
18 198/2024
Before Hon'ble HPERC in the Matter of M/s Jala Shakti Limited V/s The State of Himachal Pradesh, HPSEB Ltd. and Others10-12-2024
19 143/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Bakhnow Solar Anni Solar Power Project10-12-2024
20 132/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shareshtha Hydro Projects Pvt. Ltd09-12-2024
21 139/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s DRS Projects Solar Power Project02-12-2024
22 141/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s KK Constructions Solar Power Project02-12-2024
23 142/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Vijay Sales Corporation Solar Power Project02-12-2024
24 144/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s RBS Bus Services Solar Power Project02-12-2024
25 145/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rajneesh Kumar Solar Power Project02-12-2024
26 143/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bakhnow Solar Anni Solar Power Project02-12-2024
27 RPN114/2024
Before Hon'ble HPERC in the Matter of HPPCL V/s HPSEB Ltd.19-11-2024
28 RP112/2024
Before Hon'ble HPERC in the Matter of HPPCL V/s HPSEB Ltd. 05-11-2024
29 RP113/2024
Before Hon'ble HPERC in the Matter of HPPTCL V/s HPSEB Ltd.05-11-2024
30 136/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Neom Solar Power Project05-11-2024
31 137/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s RSVK Green Energies Solar Power Project05-11-2024
32 138/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s GK Solar Power Project05-11-2024
33 SM02/2024
Before Hon'ble HPERC in the Matter of Amendment in Model Power Purchase Agreement (PPA) for Solar PV Power Project(s) situated in the State of Himachal Pradesh28-10-2024
34 111/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd.. and M/s Himachal Renewables Limited (HRL)16-10-2024
35 105/2024
Before HPERC in the Matter of Tidong Power Generation Private Ltd V/s HPPTCL.10-10-2024
36 SM03/2024
In the Matter of HPERC V/s HPSEB Ltd.,and HPPTC Ltd.09-10-2024
37 185/2024
Before HPERC in the Matter of Clarificatory Petition on Commission’s Order dated 15.03.2024 on Business Plan and Mutli year tariff Order for 5th Control Period (FY25-29), ARR and Determination of Tariff for FY25 & True-up of FY23 of the 4th MYT Control Period for HPSEBL.09-10-2024
38 121/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd.. and M/s Naina Solar Power Project08-10-2024
39 122/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s MTN Solar Power Project08-10-2024
40 123/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shiv Ram Solar PV Project08-10-2024
41 124/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s RDVP Solar Power Project08-10-2024
42 125/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Charvik Infrastructure Solar PV Project08-10-2024
43 126/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Hansraj Solar Private Limited Solar Power Project08-10-2024
44 72/2023
Before Hon'ble HPERC in the matter M/s Usaka Hydro Powers (P) Limited V/s HPSEB Ltd.26-09-2024
45 02/20
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and Determination of Tariff for 3rd and 4th Control Period from COD to FY 2023-24 for 33/220kV, 80/100 MVA GIS Sub-Station at Phojal along with 220kV D/C LILO Transmission Line of HPPTCL10-09-2024
46 99/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and Determination of Tariff for 4th Control Period from CoD to FY 2023-24 for 400/220 kV System of 400/220/33 kV GIS Sub-station at Lahal (Asset-1) and 400 kV D/C Lahal - Chamera Transmission Line (Asset-2) of HPPTCL10-09-2024
47 103/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Varun Jal Vidyut Shakti Pvt. Ltd09-09-2024
48 104/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sai Eternal Foundation09-09-2024
49 115/2024
Before Hon'ble HPERC in the Matter of M/s Kangra Hydro Power Ventures Pvt. Ltd. & Another Versus the HPPTCL & Others09-09-2024
50 107/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Ganpati Solar Power Project 04-07-2024
51 108/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Ganpati Solar Power Project04-07-2024
52 102/2024
Before Hon'ble HPERC in the Matter of Petition for authentication of the renewable energy against Renewable Power Purchase Obligation (RPO) for FY 2023-2419-06-2024
53 78/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s HPPCL for for approval of the Power Purchase Agreement (Solar) in respect of the Bhanjal Solar Power Plant (5.0 MWAC).13-06-2024
54 28/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and determination of tariff for 4th Control Period from COD to FY 2023-24 for 220 kV LILO of Panchkula-Kunihar Transmission Line of HPPTCl12-06-2024
55 01/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and determination of Tariff for the period from COD (20.05.2022) to FY 2023-24 for 66kV GIS Switching Sub-station at Urni (Asset-1) and for the period from COD (20.05.2022) to FY 2023-24 for 66kV D/C Line from Urni Switching Station to Wangtoo Sub-station (Asset-2) of HPPTCL12-06-2024
56 27/2024
Before Hon'ble HPERC in the Matter of Determination of Tariff for FY 2024-25 to 2028-29 for Sale of Power from Baspa II 300 MW HEP to HPSEBL and JSW Hydro Energy Limited12-06-2024
57 22/2024
Before Hon'ble HPERC in the Matter of Approval of Schedule of Service Connection Charges, containing normative rates of Infrastructural Development Charges (IDC) to be recovered05-06-2024
58 29/2024
Before Hon'ble HPERC in the Matter of True Up of FY 2019-20, FY 2020-21 & FY 2021-22 and Mid-Term Review for the FY 2022-23 and FY 2023-24 for HPPTC Ltd.05-06-2024
59 24/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost along with Additional Capitalization and Determination of Tariff for Integrated Kashang Hydro Electric Project (IKHEP) Stage-I (1x65MW) Date of Commercial Operation (COD) to Financial Year (FY) 2023-2405-06-2024
60 25/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost along with Additional Capitalization and Determination of Tariff for Sainj Hydro Electric Project (HEP)(2x50MW) from Date of Commercial Operation (COD) to Financial Year (FY) 2023-2405-06-2024
61 26/2024
Before Hon'ble HPERC in the Matter of Approval of Capital Cost along with Additional Capitalization and Determination of Tariff for Sawra Kuddu Hydro Electric Project (HEP) (3x37MW) from Date of Commercial Operation (COD) to Financial Year (FY) 2023-2405-06-2024
62 73/2023
Before Hon'ble HPERC in the Matter of HPPTCL V/s HPSEB Ltd.22-05-2024
63 20/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rudra Small Hydro Electric Project V/s M/s Rudra Small Hydro Electric Project M/s Rudra Small Hydro Electric Project The Himachal Pradesh Energy Development Agency, (HIMURJA)14-05-2024
64 63/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s New Dhauladhar Hydro Project V/s The Himachal Pradesh Energy Development Agency (HIMURJA)14-05-2024
65 65/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rahul Solar Power Project03-05-2024
66 66/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sunrise Solar Power Project03-05-2024
67 67/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Jai Singh Thakur Solar Power Project03-05-2024
68 68/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Camson Industries Solar Power Project03-05-2024
69 71/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Dev Hari Solar Power Project03-05-2024
70 72/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Aditya Solar Power Project03-05-2024
71 73/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shiv Shakti Solar Power Project03-05-2024
72 74/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bhagawati Solar Power Project03-05-2024
73 75/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s S Photon Solar Power Project03-05-2024
74 79/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Neelam Solar Power Project03-05-2024
75 80/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Dhiman Electrical Company Solar Power Project03-05-2024
76 85/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Chandan Solar Power Project03-05-2024
77 86/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shiv Shakti Solar Power Project03-05-2024
78 88/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Gulshan Kumar Thakur Solar Power Project03-05-2024
79 89/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Vashisht Urja Solar Power Project03-05-2024
80 90/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Green Energies Solar Power Project03-05-2024
81 91/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sunrise Power Project03-05-2024
82 92/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sustainable Solar Energy Company Solar Power Project03-05-2024
83 93/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Radhey Solar Power Project03-05-2024
84 94/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Saraswati Raj Solar Power Project03-05-2024
85 95/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s A.V. Akshay Urja Solar Power Project03-05-2024
86 96/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shree Sai Solar Power Project03-05-2024
87 97/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shiva Green Energy Solar Power Project03-05-2024
88 98/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Deepmala Solar Power Project03-05-2024
89 64/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and The Municipal Corporation Solar Power Project03-05-2024
90 69/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s VR Solar Power Project12-04-2024
91 70/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s VR Solar Power Project12-04-2024
92 76/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s MVR Solar Power Project12-04-2024
93 77/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sheela Solar Power Project12-04-2024
94 83/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s MVR-II Solar Power Project12-04-2024
95 87/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Smile Resort Solar Power Project12-04-2024
96 48/2024
Before The HPERC in the Matter of The HPSEB Ltd. & HPPCL V/s H.P SLDC12-04-2024
97 46/2021
Before Hon'ble HPERC in the Matter of M/s Everest Power Private Limited V/s HPPTCL12-04-2024
98 48/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and HPPCL V/s HPSLDC12-04-2024
99 71/2023
Before Hon'ble HPERC in the Matter of Tidong Power Generation Private Ltd V/s HPPTC Ltd.12-04-2024
100 58/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s BRK Green Tech. Solar Power Project10-04-2024
101 59/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Eco Energies Solar Power Project10-04-2024
102 60/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rockwell Industries Solar Power Project10-04-2024
103 61/20224
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Evaz Solar Power Project10-04-2024
104 62/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sarswati Solar Power Project10-04-2024
105 82/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s KLS Solar Power Project10-04-2024
106 84/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s P.K. Kalia Solar Power Project10-04-2024
107 91/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Krishna Power Solar Project10-04-2024
108 47/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s New Dhauladhar Techno Power Pvt. Ltd10-04-2024
109 50/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Swabhi Solar Power Project10-04-2024
110 51/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Pankaj Kapoor Solar Power Project10-04-2024
111 52/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Jai Mata Solar Power Project10-04-2024
112 53/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Jai Guru Dev Solar Power Project10-04-2024
113 54/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Virajatav Power Pvt. Ltd. Solar Power Project10-04-2024
114 55/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Super Singer Enterprises Solar Power Project10-04-2024
115 56/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Palak Thakur Solar Power Project10-04-2024
116 57/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s 27 Miles Solar Park Solar Power Project10-04-2024
117 49/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Padhas Hydel Projects Pvt. Ltd09-04-2024
118 39/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Paavany Greens Pvt. Ltd02-04-2024
119 40/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Prodigy Hydro Power Pvt. Ltd02-04-2024
120 41/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bhaskar Urja Solar Power Project02-04-2024
121 42/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Anuradha Solar Power Project02-04-2024
122 43/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shrikhand Kailash Solar Power Project02-04-2024
123 44/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bajrang Construction Solar Power Project02-04-2024
124 45/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Him Solar Energy Power Project02-04-2024
125 46/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s B.S. Farms (Solar Venture)02-04-2024
126 34/2023
Before Hon'ble HPERC in the Matter of M/s Shivalik Energy Private Limited, Chirchind Hydro Pvt. Ltd. V/s HPPTCL, HPSEBL & Others28-03-2024
127 37/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s DLI Power (India) Pvt. Ltd21-03-2024
128 38/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ginni Global Pvt. Ltd.21-03-2024
129
Order on Fixing the rate of sale of Free Power of the Government of Himachal Pradesh to Himachal Pradesh State Electricity Board Limited (HPSEBL) for FY 2024-2515-03-2024
130 14 & 15/2024
TRUE UP OF UNCONTOLLABLE PARAMETERS FOR FY 2022-23, ARR & DETERMINATION OF TARIFF FOR FY 2024-25, And BUSINESS PLAN AND MULTI-YEAR ANNUAL REVENUE REQUIREMENT FOR THE FIFTH CONTROL PERIOD (FY 2024-25 TO FY 2028-29) FOR DISTRIBUTION BUSINESS of HPSEB Ltd.15-03-2024
131 23/2024
Order on True Up for the Period FY 2020-21 to FY 2022-23, Provisional True-up for FY 2023-24 & Business Plan and Multi Year Tariff for FY 2024-25 to FY 2028-29 For Himachal Pradesh State Load Despatch Centre (HPSLDC)15-03-2024
132 01/2024
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariff for Solar PV Projects for FY 2024-2514-03-2024
133 113/2023
Before Hon'ble HPERC in the Matter of Approval and Inclusion of Capital Expenditure Schemes for Restoration of 3x42 MW Larji Power House in the CAPEX Plan of Generation Business of HPSEBL for 4th MYT Control Period (FY20 to FY24)14-03-2024
134 31/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sher Singh & Brothers Solar Power Project11-03-2024
135 32/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Richmit Solar Power Project-211-03-2024
136 33/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s K.K. Kashyap Green Solar Energy Producer-II11-03-2024
137 34/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Surya Solar Power Project11-03-2024
138 35/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rathor Solar Power Project11-03-2024
139 36/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Jai Maa Sitala Solar Power Project11-03-2024
140 40/2023
Before Hon'ble HPERC in the Matter of True-up for third MYT Control Period (FY 2014-15 to FY 2018-19) & Mid-Term Performance Review for Fourth MYT Control Period (FY 2019-20 to FY 2023-24) for Generation Business26-02-2024
141 41/2023
Before Hon'ble HPERC in the Matter of Approval of Capital Cost and determination of tariff for 4th Control Period from CoD to FY 2023-24 for 220 kV Snail-Hatkoti D/C Transmission Line26-02-2024
142 SM08/2023
Before Hon'ble HPERC in the Matter of Fixation of normative O&M charges to be paid by the Small Hydro Power Project(s) and other RE generators connected at Sub-stations owned by the Distribution Licensee23-02-2024
143 120/2023
Before Hon'ble HPERC in the Matter of M/s Ankur Solar Power Project V/s HPSEB Ltd.23-02-2024
144 45/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Power Contractor Association and others.16-02-2024
145 16/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Indrasan Solar Power Project14-02-2024
146 17/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Neela Solar Power Project14-02-2024
147 18/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Malti Solar Power Project14-02-2024
148 19/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Akash Solar Power Project14-02-2024
149 02/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Balwant Singh Solar Power Project11-01-2024
150 03/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Maharaja Solar Power Project11-01-2024
151 04/24
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Parmar Solar Power Project11-01-2024
152 05/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Adhiraj Solar Power Project11-01-2024
153 06/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Asha Energy Solar Power Project11-01-2024
154 07/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Kunti Devi Solar Power Project11-01-2024
155 08/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shivam Solar Power Project11-01-2024
156 09/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rajinder Pal Singh Solar Power Project11-01-2024
157 10/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Manoj Kumar Solar Power Pr11-01-2024
158 11/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s S & S Solar Power Project11-01-2024
159 12/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Maa Naina Power Project11-01-2024
160 13/2024
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Parnwal Solar Power Project11-01-2024
161 74/2023
Before Hon'ble HPERC in the Matter of M/s IA Hydro Energy Ltd. Vs. the HPSEBL and Another10-01-2024
162 116/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shagun Solar Power Project10-01-2024
163 117/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shri Mahunag Solar Power Project10-01-2024
164 118/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s R.S. Builder Solar Power Project10-01-2024
165 119/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s AMG Green Sun Solar Power Project10-01-2024
166 121/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rudra Transport Co. Solar Power Project10-01-2024
167 122/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Gurasees Solar Power Project10-01-2024
168 123/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Suman Dhairya Solar Power Project10-01-2024
169 114/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Aditya Urja-II Solar Power Project30-12-2023
170 115/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Solding Hydrowatt Pvt. Ltd.30-12-2023
171 90/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s SS Chauhan Construction Pvt. Ltd. Solar Power Project02-12-2023
172 91/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Himsun Solar Power Project02-12-2023
173 99/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Martand Green Energy02-12-2023
174 100/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shailja Solar Power Project02-12-2023
175 101/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ground Mounted Solar Power Project02-12-2023
176 109/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s India Green Solar Power Project02-12-2023
177 07/2023
Before Hon'ble HPERC in the Matter of Determination of Generic Levellised Tariffs for Small Hydro Projects above 100 kW for 4th Control Period (i.e. 01.10.2023 to 31.03.2027)17-11-2023
178 27/202
Before Hon'ble HPERC in the Matter of Approval of capital cost and determination of tariff for the period starting from COD to FY 2023-24 for 200 kV D/C Bajoli Holi HEP –Lahal transmission line17-11-2023
179 28/2023
Before Hon'ble HPERC in the Matter of Approval of MYT petition for Approval of Capital Cost and determination of Tariff for the period starting from COD to FY 2023-24 for 220/33 kV system of 400/220/33 kV pooling station at Lahal along with 220 kV S/C Transmission Line from Lahal pooling station to Budhil HEP17-11-2023
180 46/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Kalia Solar Power Project10-11-2023
181 47/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s P.K. Kalia Solar Power Project10-11-2023
182 102/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s V.L. Solar Power Project10-11-2023
183 107/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s MVD Solar Power Project10-11-2023
184 108/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s MVD Solar Power Project10-11-2023
185 39/2023
Before Hon'ble HPERC in the Matter of M/s Brua Hydrowatt Pvt. Ltd. V/s HPPTCL, HPSEBLL and Others04-11-2023
186 06/2023
Before Hon'ble HPERC in the Matter of Determination of Generic Levellised Tariff for Solar PV Projects for FY 2023-24 (for a period w.e.f 01.10.2023 to 31.03.2024)04-11-2023
187 49/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Seema Devi Solar Power Project03-11-2023
188 50/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Minakshi Solar Power Project03-11-2023
189 54/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rudra Transport Company Solar Power Project03-11-2023
190 55/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sunrise Solar Power Project03-11-2023
191 57/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bhubaneswari-II Solar Power Project03-11-2023
192 58/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Green Energy Artisons03-11-2023
193 59/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s VSBR Solar Projects03-11-2023
194 60/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Vijay Soni Solar Projects03-11-2023
195 61/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ranjna Kumari Solar Power Project03-11-2023
196 62/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ravinder Gaur Solar Power Project03-11-2023
197 63/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Hanora Solar Power Project03-11-2023
198 64/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Jamwal Solar Power Project03-11-2023
199 67/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Kamaksha Solar Power Project03-11-2023
200 68/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sai Solar Power Project03-11-2023
201 69/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rudransh Solar Power Project03-11-2023
202 70/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Master Jee Solar Power Project03-11-2023
203 86/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Bhavish Solar Power Project03-11-2023
204 87/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Him Solar Plant03-11-2023
205 88/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sunvision Solar Power Project03-11-2023
206 89/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s SS Chauhan Construction Pvt. Ltd. Power Solar Project03-11-2023
207 103/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Galtu Solar Power Project03-11-2023
208 104/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Rakesh Katoch Solar Power Project03-11-2023
209 105/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sanoj Katoch Solar Power Project03-11-2023
210 106/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shakunlok Solar Power Project03-11-2023
211 110/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ankur Solar PV Project03-11-2023
212 111/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shiv Kripa Solar Power Project03-11-2023
213 32/2023
Before Hon'ble HPERC in the Matter HP Power Transmission Corporation Limited V/s The State of HP, HPSEB Ltd.& Others01-11-2023
214 85/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Sunshine Power Project21-10-2023
215 92/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Sandeep Solar Power Project21-10-2023
216 93/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Himachal Green Power Project21-10-2023
217 94/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Nadda Solar Power Project21-10-2023
218 95/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Sher-e-Punjab Solar Power Project21-10-2023
219 96/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Maa Chaturbhuja Solar Power Project21-10-2023
220 97/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Alok Solar Power Project21-10-2023
221 98/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Amar Sandhya Power Project21-10-2023
222 48/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Abhinav Synergy Solar Power Project19-10-2023
223 51/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Shree Rudra Green Solar Power Project19-10-2023
224 52/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s N.B. Power Project Pvt. Ltd.19-10-2023
225 53/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Sri Sai Solar Power Project19-10-2023
226 56/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Prakash Chand & Brothers Solar Power Project19-10-2023
227 65/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Shiv Shakti Solar Power Project19-10-2023
228 66/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Dhiman Solar Power Project19-10-2023
229 76/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Northern Star Solar Farm19-10-2023
230 75/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Rajakhasa Solar Power Project17-10-2023
231 77/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Nav Bharat Construction Company’s Solar Power Project17-10-2023
232 78/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Shiva Solar Power Project17-10-2023
233 79/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Bali Solar Power Project17-10-2023
234 80/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Guru Kirpa Solar Power Project17-10-2023
235 81/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Shiv Kirpa Solar Power Project17-10-2023
236 82/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Maa Bala Sundri Solar Power Project17-10-2023
237 83/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Sirmaur Solar Power Project17-10-2023
238 84/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Hamir Solar Power Project17-10-2023
239 29/2023
Before Hon'ble HPERC in the Matter of The Bonafide Himachalies Hydro Power Developers Association V/s HPSEBL and Others16-10-2023
240 44/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sumurja Shakti Pvt. Ltd.,27-09-2023
241 26/2023
Before Hon'ble HPERC in the Matter HP Power Transmission Corporation Limited V/s HPSEB Ltd.,The HP Power Transmission Corporation Ltd., M/s Tranda Hydro Power Pvt. Ltd.26-09-2023
242 32/2023
Before Hon'ble HPERC in the Matter HP Power Transmission Corporation Limited V/s The State of HP, HPSEB Ltd.& Others26-09-2023
243 43/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s V.B. Hydro Projects Ltd. V/s HPPTC Ltd.06-09-2023
244 42/2023
Before Hon'ble HPERC in the Matter of Petition for Approval of Capital Expenditure of Additional Scheme for up-gradation of existing 2x3.15 MVA, 33/11 kV Bijhar (Kotla) Sub-Station to 132 kV level GIS Sub-Station along with construction of 132 kV S/C transmission line on D/C towers from 132/33 kV Sub-station Jahoo to proposed 2x16/20 MVA, 132/33 kV GIS Sub-Station Bijhar (Kotla)09-08-2023
245 36/2022
Before Hon'ble HPERC in the Matter of M/s Swadeshi Distributors LLP V/s DOE, MNRE and HPSEB ltd.26-07-2023
246 35/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Power Contractor Association and Others.11-07-2023
247 10/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s DSL Hydrowatt Ltd.06-07-2023
248 38/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s DOE, Himuja and HPPCL23-06-2023
249 RP16/2023
Before Hon'ble HPERC in the Matter of M/s Leond Hydro Power Private Ltd. V/s HPSEB Ltd.03-06-2023
250 31/2023
Before Hon'ble HPERC in the Matter of M/s Kangra Hydro Power Ventures Pvt. Ltd V/s HPSEB Ltd. and others01-06-2023
251 17/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s HPPTCL, HPPCL and Others for the approval of the 250 MW Solar Power procurement through Tariff Based Competitive Bidding Process from Grid Connected Solar PV power projects located within Himachal Pradesh20-05-2023
252 30/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Excel Hydro Power Pvt. Ltd.20-05-2023
253 02/2023
Before Hon'ble HPERC in the Matter of True-Up of tariff for FY 2019-20 to FY 2021-22 and Mid Term Review for FY 2022-23 and FY 2023-24 for sale of power from Baspa II HEP to HPSEBL16-05-2023
254 12/2023
Before Hon'ble HPERC in the Matter of M/s DLI Power (India) Pvt. Ltd. V/s HPPTCL and Others.15-05-2023
255 78/2022
Before Hon'ble HPERC in the Matter of HPPTCL V/s HPSEB Ltd.15-05-2023
256 01/2023
Fourth Annual Performance Review Order For 4th MYT Control Period (FY20-FY24) & Determination of Tariff for FY24 & True-up of FY22 of 4th MYT Control Period for HPSEB Ltd.31-03-2023
257 SM 11/2023
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariff for Solar PV Projects for FY 2023- 2431-03-2023
258 24/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Nanal Hydro Power Consultancy Pvt. Ltd.31-03-2023
259 25/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s The Directorate of Energy and Others.29-03-2023
260
Order on Fixing the rate of sale of Free Power of the Govt. of Himachal Pradesh to Himachal Pradesh State Electricity Board Limited (HPSEBL) for FY 2023-2428-03-2023
261 18/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Ginni Global Pvt. Ltd28-03-2023
262 19/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Prodigy Hydro Power Pvt. Ltd28-03-2023
263 20/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Gangdari Hydro Power Pvt. Ltd28-03-2023
264 21/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Greenko Tejassarnika Hydro Energies Pvt. Ltd.28-03-2023
265 22/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Greenko Sumez Hydro Energies Pvt. Ltd28-03-2023
266 23/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Padhas Hydel Projects Pvt. Ltd.28-03-2023
267 RP77/2022
Before Hon'ble HPERC in the Matter of M/s Sai Engineering Foundation V/s HPSEB Ltd. & Others22-03-2023
268 13/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s DLI Power (India) Pvt. Ltd07-03-2023
269 14/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s G R Auditya Renewable Energies Pvt. Ltd07-03-2023
270 15/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Palchan Bhang Power Pvt. Ltd07-03-2023
271 33/2022
Before Hon'ble HPERC in the Matter of M/s DLI Power (India) Pvt. Ltd. V/s HP Power Transmission Corporation Ltd., and others13-02-2023
272 05/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and HP Power Corporation Ltd.13-02-2023
273 32/2022
Before Hon'ble HPERC in the Matter of M/s DLI Power (India) Pvt. Ltd. V/s HP Power Transmission Corporation Ltd.07-02-2023
274 45/2021
Before Hon'ble HPERC in the Matter of M/s Panchhor Hydro Power Pvt. Ltd V/s HPSEB Ltd. and Others30-01-2023
275 70/2022
Before Hon'ble HPERC in the Matter of The HP State Load Despatch Centre V/s The Stakeholders/ Objectors28-01-2023
276 45/2022
Before Hon'ble HPERC in the Matter of M/s Swadeshi Distributors LLP and M/s Jagdambey Hydro Projects LLP V/s HPPTCL, HPSEB Ltd. and GoHP27-01-2023
277 03/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Sanjeev Kumar Solar Power PV Project21-01-2023
278 04/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Mandri Devi Solar PV Project21-01-2023
279 06/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and UTRI HR Services Pvt. Ltd21-01-2023
280 07/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and GRT Solar Power Project21-01-2023
281 08/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Diyar Solar Power Project21-01-2023
282 09/2023
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Sahkari Sabha Solar PV Project21-01-2023
283 42/2022
Before Hon'ble HPERC in the Matter of M/s Leond Hydro Power Private Limited V/s HPSEB Ltd.07-01-2023
284 76/2022
Before Hon'ble HPERC in the Matter of Approval of Capital Expenditure for Revamped Distribution Sector Scheme of HPSEBL and HPSEB Ltd.28-12-2022
285 36/2022
Before Hon'ble HPERC in the Matter of True-up Petition for MYT Control Period from FY 2014-15 to FY 2018-19 of Himachal Pradesh Power Transmission Corporation (HPPTCL)28-12-2022
286 35/2022
Before Hon'ble HPERC in the Matter of M/s Brua Hydrowatt Pvt. Ltd. V/s The HP Power Transmission Corporation Ltd. and others27-12-2022
287 53/2022
Before Hon'ble HPERC in the Matter of M/s Shivalik Energy Private Limited, Chirchind Hydro Pvt. Ltd., Chirchind Hydro Pvt. Ltd. V/s HPPTCL and Others19-12-2022
288 34/2022
Before Hon'ble HPERC in the Matter of The All India Renewable Energy V/s HPSEB Ltd., And Others15-12-2022
289 41/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s Directorate of Energy and Others28-11-2022
290 28/2019
Before Hon'ble HPERC in the Matter of Approval of the Aggregate Revenue Requirement (ARR) for FY 20 and the Multi Year Tariff of the Fourth MYT Order for the Control Period (FY20-24) and HPSEBL and HPSLDC and Malana Power Company Limited28-11-2022
291 38/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Prime Steel Industries Pvt. Ltd and Others23-11-2022
292 73/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sahil Vasishta Solar PV Project23-11-2022
293 74/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Sunshine Solar PV Project23-11-2022
294 75/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Shanti Solar Urja Project23-11-2022
295 RP46/2022
Before Hon'ble HPERC in the Matter of M/s Varun Jal Vidyut Shakti Pvt. Ltd. V/s HPSEB Ltd. 16-11-2022
296 31/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Mahamai Hydro Power Pvt. Ltd.15-11-2022
297 69/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Wil Power Projects Ltd.15-11-2022
298 59/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Swan Rangers Solar PV Project28-10-2022
299 60/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Dharamjit Solar PV Project28-10-2022
300 61/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Khajuriya Solar PV Project28-10-2022
301 65/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Kartik Solar PV Project28-10-2022
302 66/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Ankit Solar PV Project28-10-2022
303 67/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Ajay Solar PV Project28-10-2022
304 68/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Surya Solar PV Project28-10-2022
305 27/2022
Order on determination of Capital Cost and Project Specific Levelized Tariff for Ghanvi II SHEP (10 MW)28-09-2022
306 28/2022
Approval of Capital Cost and determination of tariff for 33/132kV GIS Sub-station at Chambi (Shahpur) alongwith 132 kV D/C Transmission Dehra-Kangra Transmission Line to GIS pooling Sub-station at Chambi for the period from COD to FY 2023-2428-09-2022
307 29/2022
Approval of Capital Cost and determination of tariff for 400/220/66 kV GIS Pooling Sub Station Wangtoo (Sherpa Colony) for the period from COD to FY 2023-2428-09-2022
308 30/2022
Approval of Capital Cost and determination of tariff for 33/132 kV, GIS Sub-Station at Pandoh along with LILO of one circuit of 132 kV D/C Kangoo-Bajaura Transmission line (Asset-1) and Additional 33/132 kV, 31.5 MVA Transformer with associated GIS at 33/132 kV at Pandoh (Asset-2) for the period from COD to FY 2023-2428-09-2022
309 03/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Swadeshi Distributors LLP28-09-2022
310 51/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and Sai Solar PV Project27-09-2022
311 57/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Manikaran Hydro Pvt. Ltd27-09-2022
312 58/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Manikaran Hydro Pvt. Ltd27-09-2022
313 55/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. and M/s Gopal Hydrogen Pvt. Ltd 24-09-2022
314 49/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s Jalpa Solar PV Project 14-09-2022
315 50/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s Chandel Solar PV Project14-09-2022
316 52/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s SSR Energy Solar PV Project14-09-2022
317 73/2019
Before Hon'ble HPERC in the Matter of HPSEB Ltd. & M/s Kangra Hydro Power Venture Pvt. Ltd V/s The HIMURJA05-09-2022
318 40/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s Kathwari Solar PV Project.24-08-2022
319 43/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s A Himalayan Hydro Project.24-08-2022
320 47/2022
Before Hon'ble HPERC in the Matter HPSEB Ltd., V/s M/s Bani Solar PV Project24-08-2022
321 50/2021
Before Hon'ble HPERC in the Matter of The HP State Load Despatch Centre V/s HPSEB Ltd. & Others06-08-2022
322 51/2021
Before Hon'ble HPERC in the Matter of The HP Power Transmission Corp. Ltd. V/s HPSEB Ltd. & others06-08-2022
323 02/2022
Supplementary Order w.r.t. Mid-Term Performance Review Order For 4th MYT Control Period (FY20-FY24) & Determination of Tariff for FY23 & True-up of FY19,20,2119-07-2022
324 02/2022
Revised Tariff Order w.r.t Domestic Tariff Category w.e.f 01 July,202205-07-2022
325 37/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Ikshvaku Solar PV Project05-07-2022
326 04/2022
Before Hon'ble HPERC in the Matter of M/s Neri Hydro Projects Pvt. Ltd V/s HPSEB Ltd., & Others21-05-2022
327 47/2021
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Gopal Hydrogen Pvt. Ltd.21-05-2022
328 10/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., and M/s Dev Bhumi Hydro Power Pvt. Ltd. 21-05-2022
329 SM23/2022
Before Hon'ble HPERC in the HPERC V/s M/s Varun Jal Vidyut Shakti (P) Ltd &. HPSEB Ltd,.18-05-2022
330 21/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Himalaya Hydel Energy Pvt. Ltd17-05-2022
331 22/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Ginni Global Pvt. Ltd17-05-2022
332 24/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s R.D. Power17-05-2022
333 25/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Shiva Power17-05-2022
334 26/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s SS Energy Ltd. 17-05-2022
335 12,48/2021
Before Hon'ble HPERC in the Matter of M/s Tidong Power Generation Pvt. Ltd. V/s The HP Power Transmission Corporation Ltd. and The HP Power Corporation Ltd V/s The HP Power Transmission Corporation Ltd and Others.02-05-2022
336 20/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s HP Power Corporation Ltd19-04-2022
337 06/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd.,V/s M/s Kin Hydro Power Developers19-04-2022
338 02/2022
Mid-Term Performance Review Order For 4th MYT Control Period (FY20-FY24) & Determination of Tariff for FY23 & True-up of FY19,20,2129-03-2022
339 11/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd.,V/s M/s DLI Power (India) Pvt. Ltd28-03-2022
340 12/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s The Bhutti Weavers Co-operative Society Ltd.28-03-2022
341 38/2021
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Om Energy Generation Pvt. Ltd28-03-2022
342
Order on Fixing the rate of sale of Free Power of the Government of Himachal Pradesh to Himachal Pradesh State Electricity Board Limited (HPSEBL) for FY 2022-2328-03-2022
343 07/2022
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariff for Solar PV Projects for FY 2022- 2328-03-2022
344 19/2021
Before Hon'ble HPERC in the Matter of M/s Harisons Hydel Const. Co.Pvt. Ltd V/s Directorate of Energy, HPSEB Ltd., and Others24-03-2022
345 25/2021
Before Hon'ble HPERC in the Matter of M/s Ascent Hydro Projects Ltd. V/s DOE, HPSEB Ltd. and Others24-03-2022
346 49/2021
Before Hon'ble HPERC in the Matter of M/s Varun Jal Vidyut Shakti Pvt. Ltd. V/s HPSEB Ltd.24-03-2022
347 13/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Greenko Sumez Hydro Energies Pvt. Ltd23-03-2022
348 14/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Greenko Tejassarnika Hydro Energies Pvt. Ltd23-03-2022
349 15/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Gangdari Hydro Power Private Limited23-03-2022
350 16/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Ginni Global Private Limited23-03-2022
351 17/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Nanal Hydro Power Consultancy Pvt. Ltd23-03-2022
352 18/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Prodigy Hydro Pvt. Ltd.23-03-2022
353 19/2022
Before Hon'ble HPERC in the Matter of HPSEB Ltd., V/s M/s Padhas Hydel Project Pvt. Ltd23-03-2022
354 05/2022
Before Hon'ble HPERC in the Matter of M/s Soiel Dashal Hydro Power Pvt. Ltd., V/s Principal Secretary, GoHP (MPP& Power), and HPSEB Ltd.22-03-2022
355 01/22
Before Hon'ble HPERC in the Matter HPSEB Ltd., V/s M/s Sai Engineering Foundation21-02-2022
356 01/2020
Before Hon'ble HPERC in the Matter of M/s Pinnacle Hydro Energy Pvt. Ltd.V/s HPSEB Ltd.15-02-2022
357 28/2021
Before Hon'ble HPERC in the Matter of Determination of Average Pooled Power Purchase Cost (APPC) for the financial year 2021-22 under REC mechanism03-01-2022
358 21/2021
Before Hon'ble HPERC in the Matter of M/s Changer Vidyut Kranti (P) Ltd., V/s The State of Himachal Pradesh, HPSEBL and others15-12-2021
359 78/2020
Before Hon'ble HPERC in the Matter of M/s Batot Hydro Power Ltd, M/s Belij Hydro Power Ltd, M/s Jal Shakti Ltd V/s The State of Himachal Pradesh, HPPTCL, HPSEBL, Himurja09-12-2021
360 29/2021
Before Hon'ble HPERC in the Matter of Authentication of Renewable Energy Purchase (Non-Solar & Solar) for FY 2020-21.02-12-2021
361 96/2020
Before the Himachal Pradesh Electricity Regulatory Commission in the matter of Petition for ARR for fourth MYT Control Period (FY2019-20 to FY 2023-24) and True-up for second MYT Control Period (FY 2011-12 to FY 2013-14) for Generation Business of HPSEB Ltd.11-11-2021
362 98/2020
Approval of MYT petition for approval of capital cost and determination of tariff for the period starting from COD (12th May, 2018) to FY 2023-24 for 33/220kV GIS sub-station at Karian along with 220kV D/C transmission line to PGCIL pooling sub-station at Chamera-II01-11-2021
363 03/2021
Order w.r.t Authentication of Renewable Energy Purchase (Non-Solar & Solar) for FY 2019-2014-09-2021
364 99/2020
Before Hon'ble HPERC in the Matter of M/s Ascent Hydro Projects Ltd. V/s HPSEB Ltd.07-09-2021
365 100/2020
Before Hon'ble HPERC in the Matter of M/s Harison Hydel Const. Co. Pvt. Ltd., V/s HPSEB Ltd. & Others07-09-2021
366 04/2021
Order w.r.t Authentication of Renewable Energy Power Purchase (Non-Solar and Solar) for FY 2017-18 & FY 2018-1919-08-2021
367 14/2021
Order on True Up for the Period FY 2018-19 & FY 2019-20 Provisional True-up for FY 2020-21 & Mid-Term Review Order for the Period FY 2021-22 to FY 2023-2412-08-2021
368 97/2020
Approval of Capital Cost and determination of tariff for 220 kV D/C Charor-Banala Transmission line for the Period from COD to FY 2023-2412-08-2021
369 22/2021
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariffs for Solar PV Projects for FY 2021-2222-07-2021
370 11/2021
Second Annual Performance Review Order For 4th MYT Control Period (FY20-FY24), Determination of Tariff for FY22 and True up for FY19 and FY20.31-05-2021
371 23/2021
Order on Fixing the rate of sale of Free Power of the Govt. of Himachal Pradesh to Himachal Pradesh State Electricity Board Limited (HPSEBL) for FY 2021-2206-05-2021
372 09/2021
Before Hon'ble HPERC in the Matter of Determination of Average Pooled Power Purchase Cost (APPC) for the financial year 2020-21 under REC mechanism31-03-2021
373 SM08-2021
Before Hon'ble HPERC In the Matter of Determination of generic levellised tariff for Small Hydro Projects upto 100 kW (01.04.2021 to 30.09.2023).31-03-2021
374 08/2020
Before Hon'ble HPERC in the Matter of M/s Brua Hydrowatt Pvt. Ltd., V/s HPSEB Ltd. & Others22-03-2021
375 79/2019
Before Hon'ble HPERC in the Matter of M/s Gehra Hydro Power Private Ltd., V/s HPSEB Ltd. & Others28-01-2021
376 SM79-2020
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariffs for Solar PV Projects for FY 2020-2115-01-2021
377 64/2020
Before Hon'ble HPERC in the Matter of M/s JSW Hydro Energy Ltd. , V/s HPSEB Ltd. & Others28-12-2020
378 76/2020
Determination of Generic Levellised Tariffs for Small Hydro Projects for 3rd control period i.e. 01.04.2020 to 30.09.202322-12-2020
379 7&146/2020
Before Hon'ble HPERC in the Matter of M/s G.R. Enterprises V/s HPSEB Ltd. 15-12-2020
380 03/2020
Approval of MYT petition for approval of capital cost and determination of tariff for the period starting from COD (1.06.2016) to FY 2023-24 of 220kV D/C Kashang Bhaba transmission line of Himachal Pradesh Power Transmission Corporation Ltd.26-08-2020
381 05/2020
Revision of tariff for Domestic category of the consumers on account of modification in subsidy by the Government of HP in the HPSEBL schedule of tariff, 2020 approved by the Commission in the First Annual Performance Review Order of HPSEBL for MYT Period FY20- FY24 dated 06-06-202004-08-2020
382 04/2020
Approval of Capital Cost and Determination of Tariff for 220/66kV Bhoktoo Pooling Substation for the Period from COD to FY 2023-24 (FY17-FY24) H.P. Power Transmission Corporation Limited (HPPTCL)25-07-2020
383 62/2019
Before Hon'ble HPERC in the matter of M/s Sandhya Hydro Power Projects V/s HPSEB Ltd.,HPSLDC, & Others09-07-2020
384 06/2020
True Up Order for BASPA II HEP for FY 2017-18 to FY 2018-1907-07-2020
385
Corrigendum to the Tariff Order for HPSEBL in Petition no. 5 of 2020 for FY2020-2130-06-2020
386 05/2020
First Annual Performance Review Order For 4th MYT Control Period (FY20-FY24) & Determination of Tariff for FY21 Including True-up of FY1806-06-2020
387 05/2020
Interim Order w.r.t Petition (No. 5/2020) for first Annual Performance Review(APR) for 4th MYT Control Period, determination of tariff for FY21 and True-up of FY18 for Distribution Business23-03-2020
388 76/2019
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariffs for Small Hydro Projects for 2nd Control Period i.e. 1st October 2019 to 31st March 2020.15-02-2020
389 72/2019
Before Hon'ble HPERC in the matter of Determination of Average Pooled Power Purchase Cost (APPC) for the financial year 2019-2005-02-2020
390 81/2019
Before Hon'ble HPERC in the matter of Determination of generic levellised tariffs for Solar PV Projects for the last six months of FY 2019-20 (i.e. 1st October, 2019 to 31st March, 2020).20-01-2020
391 54/2019
Before Hon'ble HPERC in the matter of Sh. Bal Krishan Sharma thro’ Sh. Manoj Sharma V/s M.D, HPSEBL & Others11-07-2019
392 S.M 57/2019
Determination of generic levellised tariffs for Solar PV Projects for first six months of FY 2019-2008-07-2019
393 30/2019
Multi-Year Tariff Order for BASPA II HEP for FY 2019-20 to FY 2023-2429-06-2019
394 31/2019
Multi Year Tariff Order For Himachal Pradesh Power Transmission Corporation Limited (HPPTCL) FY 2019-20 to FY 2023-2429-06-2019
395 29/2019
Order on True Up for the Period FY 2014-15 to FY 2017-18 & Multi Year Tariff for FY 2019-20 to FY 2023-24 For Himachal Pradesh State Load Despatch Centre (HPSLDC)29-06-2019
396 28/2019
MYT Tariff for HPSEBL for 4th control period (FY2019-20 to FY2023-24) & True Up FY201729-06-2019
397 11/2019
Before Hon'ble HPERC in the matter of M/s Goodwill Energy Enterprises V/s HPSEB Ltd, M/s Kut Energy Pvt. Ltd & Others10-06-2019
398 56/2019
Before Hon'ble HPERC in the matter of M/s Om Hydropower Ltd. V/s HPSEB Ltd & Others29-05-2019
399
Order on Fixing the Rate of Free Power of Govt. of HP to HPSEBL for FY 2019-2015-05-2019
400 23/2018
Before Hon'ble HPERC in the matter of HPSEB Ltd. V/s M/s Ascent Hydro Project Ltd.26-04-2019
401 38/2018
Before Hon'ble HPERC in the matter of M/s Tangling Mini Hydel Power Project V/s HPSEB Ltd & Others25-04-2019
402 16/2018
Before Hon'ble HPERC in the matter of HPSEB Ltd. V/s M/s Malana Power Company Ltd., HPPTCL & HPSLDC30-03-2019
403 41/2018
Fixation of normative rates for service line for LT connection upto 50 kW/kVA.17-12-2018
404 34/2018
Before Hon'ble HPERC in the matter of Determination of the Average Pooled Power Purchase Cost (APPC) for the financial year 2018-19 under REC mechanism26-11-2018
405 25/2018
Before Hon'ble HPERC in the matter of HPSEB Ltd. V/s M/s Auro Spinning Mills, Laghu Udyog Bharti, Jai Bharat Steel, CII, BBNIA, Parwanoo Industries Association29-10-2018
406 52/2017
Before Hon'ble HPERC in the matter of M/s Sahu Hydro Power Pvt. Ltd. V/s HPSEB Ltd.15-09-2018
407 30/2018
Before Hon'ble HPERC in the matter of M/s Karan Synthetic Pvt. Ltd. V/s HPSEB Ltd.11-09-2018
408 29/2018
Before Hon'ble HPERC in the matter of M/s Karan Polypack Pvt. Ltd. V/s HPSEB Ltd.11-09-2018
409 37/2018
Before Hon'ble HPERC in the matter of M/s Radiant Castings Ltd. V/s HPSEB Ltd.06-09-2018
410 39/2018
Before Hon'ble HPERC in the matter of M/s Brua Hydrowatt (P) Ltd. V/s HPSEB Ltd.01-09-2018
411 S.M 26/18
Determination of generic levellised tariffs for Solar PV Projects for FY 2018-1925-07-2018
412 9/2018
Before Hon'ble HPERC in the matter of M/s Yogindera Power Ltd. V/s HPSEB Ltd.30-06-2018
413 8/2018
Before Hon'ble HPERC in the matter of M/s Leond Limited V/s HPSEB Ltd.30-06-2018
414 10/2018
Before Hon'ble HPERC in the matter of M/s DLI Power (India) Pvt. Ltd. V/s HPSEB Ltd30-06-2018
415 22/2018
Before Hon'ble HPERC in the matter of M/s Radiant Casting V/s HPSEB Ltd.30-06-2018
416 11/2018
Before Hon'ble HPERC in the matter of M/s Puri Oil Mills Ltd. V/s HPSEB Ltd28-05-2018
417 13/2018
Before Hon'ble HPERC in the matter of M/s Haryana Powertech (Project-I) V/s HPSEB Ltd. & Others.19-05-2018
418 14/2018
Before Hon'ble HPERC in the matter of M/s Haryana Powertech (Project-I) V/s HPSEB Ltd. & Others.19-05-2018
419
4th APR Order for 3rd MYT Period (FY15-19) & Determination of Tariff for FY19 & True Up of FY1604-05-2018
420 7/2018
Before Hon'ble HPERC in the matter of The Himalaya Power Producers V/s HPSEB Ltd28-04-2018
421
Order on Fixing the Rate of Free Power of Govt. of HP to HPSEBL for FY 2018-1913-04-2018
422 65/2017
Before Hon'ble HPERC in the matter of Renewable Energy Purchase (Non-Solar & Solar) for FY 2016-17 under the provisions of Regulation 4(1) of the HPERC (Renewable Power Purchase Obligation and its Compliance) (Third Amendment) Regulations, 201707-04-2018
423 70/2017(SM)
Before Hon'ble HPERC in the matter of Determination of Generic Levellised Tariffs for Small Hydro Projects under Regulation 14 of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 201724-03-2018
424 51/2017
Before Hon'ble HPERC in the matter of M/s Himalaya Power Producers Association V/s HPSEB Ltd.23-02-2018
425 72/2017
Before Hon'ble HPERC in the matter of M/s Yogindera Power Ltd. V/s HPSEB Ltd.23-02-2018
426 01/2018
Determination of Generic Levellised Tariffs for Solar PV Projects for various duration of FY 2017-1812-02-2018
427 25/2017
Before Hon'ble HPERC in the matter of Eligibility of Renewable Energy Certificates (RECs) to Distribution Licensee for Renewable Energy (Non-Solar) purchased beyond Renewable Power Purchase Obligation for FY 2014-15 and matter regarding self-retention of non-solar RECs for FY 2015-16 from available inventory05-01-2018
428 28/2017
Before Hon'ble HPERC in the matter Determination of Additional Surcharge on Short Term Open Access consumers purchasing power from within/outside the State of HP.30-10-2017
429 31/2017
HPPTCL True Up of FY 2014-15 & FY 2015-16 and Mid-Term Review for the FY 2016-17, FY 2017-18 and FY 2018-1906-10-2017
430 26/2017
Before Hon'ble HPERC in the matter Eligibility of Renewable Energy Certificates (RECs) to Distribution Licensee for Renewable Energy (Solar) purchased beyond Renewable Power Purchase Obligation.05-09-2017
431 40/2016
Before Hon'ble HPERC in the matter of M/s Kanchanjunga Power Co. Pvt. Ltd V/s The H.P. Power Transmission Corporation Ltd.19-08-2017
432 32/2017
Determination of the Average Pooled Power Purchase Cost (APPC) for the financial year 2017-18 under REC mechanism.04-08-2017
433
Determination of Tariff for FY18 & Mid-Term Performance Review 17-04-2017
434
Order on Fixing the Rate of Free Power of Govt. of HP to HPSEBL for FY 2017-1810-04-2017
435 46/2016
True Up For the Period FY 2011-12 to FY 2013-14 and Mid Term Review10-04-2017
436
True Up Order For Himachal Pradesh Power Transmission Corporation Limited (HPPTCL) For the period FY 2011-12 to FY 2013-1410-04-2017
437 91/2016
Before Hon'ble HPERC in the matter of M/s Ascent Hydro Power Ltd and Others V/s HPSEB Ltd.14-03-2017
438 30/2016
Before Hon'ble HPERC in the matter of Himachal Pradesh State Electricity Board Limited V/s Directorate of Energy14-02-2017
439 35/2016
Determination of the Average Pooled Power Purchase Cost (APPC) for the financial year 2016-17 under REC mechanism.28-10-2016
440 27/2016
Determination of Additional Surcharge on Short Term Open Access consumers28-10-2016
441 31& 32/2016
Before Hon'ble HPERC in the matter of M/s Ambuja Cement Ltd, The Nalagarh Industries Association V/s HPSEB Ltd.18-10-2016
442 23/2016
Before Hon'ble HPERC in the matter of Petition under Regulation 14 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 for approval of Schedule of Service Connection Charges, containing normative rates of Infrastructural Development Charges10-10-2016
443 26/2016
Before Hon'ble HPERC in the matter of M/s DSL Hydrowatt Ltd. V/s HPSEB Ltd.06-10-2016
444 25/2016
Before Hon'ble HPERC in the matter of Mechanism for the Adjustment of Advance Cost Share towards Infrastructural Development Charges (IDC)05-10-2016
445 06/2016
Before Hon'ble HPERC in the matter The Himalaya Power Producers Association V/s HPSEB Ltd.03-08-2016
446 9/2016
Before Hon'ble HPERC in the matter M/s Jala Shakti Limited V/s HPSEB Ltd. & Others03-08-2016
447 21/2016
Before Hon'ble HPERC in the Matter M/s Winsome Textiles Industries Limited V/s HPSEB Ltd.03-08-2016
448 128/2015
Before Hon'ble HPERC in the matter of M/s Puri Oil Mills Ltd. V/s HPSEB Ltd.30-07-2016
449 124/2015
Before Hon'ble HPERC in the matter of The Indian Wind Power Association V/s HPSEB Ltd. & Others25-07-2016
450
Generic Levellised Tariff for Solar PV Projects For FY16-1706-07-2016
451 12/2016
Before Hon'ble HPERC in the Matter M/s Ginni Global Private Limited V/s HPSEB Ltd.05-07-2016
452 130/2015
2nd APR Order for 3rd MYT Period (FY15-19) & Determination of Tariff for FY17 & True Up of FY13 & 1425-05-2016
453 25 /2016
Order on Proposed Mechanism for Adjustment of Advance Cost Share towards IDC in Suo-Moto Petition 25/201624-05-2016
454
Order of Generic Levellised Tariff for MSW/RDF Projects For FY16-1707-05-2016
455 08/2016
Before Hon'ble HPERC in the matter M/s Four Seasons Power Private Ltd. V/s HPSEB Ltd.03-05-2016
456 109/2015
Before Hon'ble HPERC in the matter of M/s Nanal Hydro Power Consultancy (P) Ltd. V/s HPSEB Ltd. & Others30-04-2016
457 29/2010
Before Hon'ble HPERC in the Matter of Determination of Capital Cost and Levelised Tariff for Sarbari-II (5.4) SHP.28-04-2016
458 149/2013
Before Hon'ble HPERC in the Matter of Determination of Capital Cost and Levelised Tariff for Neogal (15MW) SHP28-04-2016
459
Order on Fixing the Rate of Free Power of Govt. of HP to HPSEBL for FY 2016-1713-04-2016
460 96/2015
Before Hon'ble HPERC in the matter of M/s Harisons Hydel Construction Co. Pvt. Ltd V/s HPSEB Ltd.15-03-2016
461 104/2015
Before Hon'ble HPERC in the Matter of Model Power Purchase Agreement (PPA) for Solar PV Power Project(s) in the State of Himachal Pradesh.29-02-2016
462 103/2015
Before Hon'ble HPERC in the matter of Determination of Additional Surcharge on Short Term Open Access consumers purchasing power from within/outside the State of HP18-02-2016
463 102/2015
Before Hon'ble HPERC in the matter of M/s Patikari Power Private Ltd. V/s HPSEB Ltd.13-01-2016
464 94/2015
Before Hon'ble HPERC in the Matter The BBN Industries Association V/s HPSEB Ltd.07-01-2016
465 133/2015
Before Hon'ble HPERC in the matter of M/s Sarabai Enterprises Pvt. Ltd. V/s HPSEB Ltd06-01-2016
466 86/2015
Before Hon'ble HPERC in the Matter of Determination of the Average Pooled Power Purchase Cost for FY 2015-16 Under REC Mechanism.07-12-2015
467 90/2015
Before Hon'ble HPERC in the matter of M/s Bhavani Renewable Energy Private Ltd. V/s HPSEB Ltd. and Others.19-11-2015
468 90/2015
Before Hon'ble HPERC in the matter of M/s Bhavani Renewable Energy Private Ltd. V/s HPSEB Ltd. and Others.19-11-2015
469 198/2014
Before Hon'ble HPERC in the matter of M/s M/s Jala Shakti Limited . V/s HPSEB Ltd. and Others.19-09-2015
470
Determination of Generic Levellised Tariff for Solar PV Projects08-09-2015
Annexures A & B 30-11--0001
471 12/2012
Before Hon'ble HPERC in the matter of Mr. P.N Bhardwaj V/s HPSEB Ltd.03-09-2015
472 55/2015
Before Hon'ble HPERC in the matter of M/s Manikaran Power Ltd V/s M/s Jaiparkash Power Ventures Ltd31-08-2015
473 77/2015
Before Hon'ble HPERC in the Matter of First Annual Performance Review Order for Third MYT Control Period (FY 15 - FY 19) & Determination of Tariff for FY 2015-16.18-08-2015
474 60/2015
Before Hon'ble HPERC in the Matter of M/s Jaiparkash Power Ventures Ltd., V/s HPSEB Ltd.04-08-2015
475 147/2014
Before Hon'ble HPERC in the Matter of The State of HP, thro’SE (I&PH) Nahan, V/s HPSEB Ltd.01-08-2015
476 134/2014
Before Hon'ble HPERC in the Matter of M/s Satya Sai Hydel Projects Pvt. Ltd.,M/s Kangra Hydro Power Venture (P) Ltd.,& Others, V/s HPSEB Ltd.20-07-2015
477 36/2015
Order on Schedule of Service Connection Charge as per HPERC (Recovery of Expenditure for Supply of Electricity ) Regulation, 201216-07-2015
478 34/2015
Before Hon'ble HPERC in the matter of M/s M/s Yogindera Power Ltd. V/s HPSEB Ltd. 10-07-2015
479 70/2015
Before Hon'ble HPERC in the Matter of M/s Winsome Textile Ind. Ltd., V/s HPSEB & Others10-07-2015
480 32/2015
Before Hon'ble HPERC in the Matter of Provisional True-up Petition filed by HPSEBL for Review of the APR order dated 27th April, 2013.03-07-2015
481
Order on Mechanism for Adjustment of Accelerated/ Additional Depriciation Benefit and Capital Subsidy for SHPs30-06-2015
482 Suo- Motu Petition No. 193/2014
Before Hon'ble HPERC in the Matter of M/s K.K.K. Hydro Power Ltd., V/s HPSEB & Others11-06-2015
483 30/2015
Before Hon'ble HPERC in the Matter of M/s Usaka Hydro Power Pvt. Ltd., HPSEB Ltd.04-06-2015
484 17/2015
Before Hon'ble HPERC in the Matter of The H.P. State Electricity Board Ltd., Others & Stakeholders23-05-2015
485
First Annual Performance Review Order for 3rd MYT Control Period (FY15-19) & Determination of Tariff for FY-16 for HPSEB Ltd.10-04-2015
Revision in the Line Maintenance and Lamp Renewal Charges under “Schedule – Street Lighting Supply” 04-07-2015
486 33/2015
Before Hon'ble HPERC in the Matter of M/s Raheja Hydel Power Pvt. Ltd., V/s HPSEB Ltd.04-04-2015
487 107/2013
Before Hon'ble HPERC in the Matter of M/s Sri Radiant Cement (P) Ltd., V/s HPSEB Ltd.04-04-2015
488 178/2014
Before Hon'ble HPERC in the Matter of Sh. L.K. Mahajan, V/s HPSEB Ltd.04-04-2015
489
Order on Fixing Rate of Sale of Free Power of Govt. of H.P to HPSEBL For FY-16.31-03-2015
490 171/2014
True Up Order for baspa-II HEP for FY12-14.30-03-2015
491 76/2014
True Up Order for FY-11 and FY-12 for HPSEB Ltd.30-03-2015
492 --
In Matter of Issuance of Certification of Excess of Renewable Energy Procurement beyond RPPO Targets for FY13-14 for Issuance of RE Certificates07-03-2015
493 182/2014
Before Hon'ble HPERC in the matter of M/sM/s Door Sanchar Hydro Power (P) Ltd. V/s HPSEB Ltd. and Others.03-03-2015
494 211/2014
Before Hon'ble HPERC in the matter of M/s M/s Door Sanchar Hydro Power (P) Ltd. V/s HPSEB Ltd. and Others.03-03-2015
495 223/2014
Before Hon'ble HPERC in the matter of M/s Gowthami Hydro Electric Com.(P) Ltd. V/s HPSEB Ltd. and Others.03-03-2015
496 108/2010
Before Hon'ble HPERC in the matter of M/s Astha Projects (I) Pvt. Ltd. V/s HPSEB Ltd and others. 17-01-2015
497 121/2010
Before Hon'ble HPERC in the matter of M/s M/S DSL Hydrowatt Limited. V/s HPSEB Ltd. and Others.17-01-2015
498 137/2010
Before Hon'ble HPERC in the matter of M/s M/S Mangalam Energy Development Company Pvt. Ltd. V/s HPSEB Ltd. and Others.17-01-2015
499 26/2011
Before Hon'ble HPERC in the matter of M/s M/s Sarabai Enterprises Pvt. Ltd. V/s GoHP, HPSEB Ltd. and Others.06-01-2015
500 11,12,14,15,16,30,62, 64,121,108/2014
Before Hon'ble HPERC in the Matter of HPSEBL V/s M/s Him Kailash Hydro Power Pvt. Ltd, M/s Ginni Global Ltd, M/s Gothawmi Hydro Eletric. Co. (P) Ltd, M/s Nizubeedu Seeds Ltd, M/s Dharamshala Hydro Power Ltd, M/s Harison Hydel Construction Co. (P) Ltd, M/s Ascent Hydro Projects Ltd, M/s Patikari Power Pvt. Ltd, M/s DSL Hydrowatt Limited, M/s Astha Projects (I) Pvt. Ltd, M/s Mangalam Energy Development Co. Pvt. Ltd, M/s Sarabai Enterprises Pvt. Ltd10-09-2014
501 107/2014
Before Hon'ble HPERC in the Matter of M/s Tangnu Romai Power Generation (P) Ltd. V/s State of H.P and HPSEBL06-09-2014
502 122/2012
Before Hon'ble HPERC in the Matter of Determination of Average Pooled Power Purchase Cost For FY 2014-15 under REC Mechanism28-08-2014
503 138/2012
Before Hon'ble HPERC in the Matter of M/s Ambuja Cements Limited. V/s HPSEB Ltd. & Others.22-08-2014
504 97/2014
Before Hon'ble HPERC in the Matter of Amendments in the Model Power Purchase Agreement for Purchase of Power by HPSEBL from Small Hydro Electric Projects.01-08-2014
505 43/14
Before Hon'ble HPERC in the Matter of Applicability of tariff as per Tariff Order issued by H.P. Electricity Regulatory Commission for the FY 2007-08 – Correct implementation of factory lighting load and colony supply thereof.28-07-2014
506 89/14
Before Hon'ble HPERC in the Matter of Petition under regulation 14 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations,2012 for approval of Schedule of Service Connection Charges, containing normative rates of Infrastructure Development Charges14-07-2014
507 22/2013
Before Hon'ble HPERC in the Matter of M/s Puri Oil Mills Limited. V/s HPSEB Ltd. & Others.10-07-2014
508 17/2014
Before Hon'ble HPERC in the Matter of M/s Four Seasons Power Private Ltd. V/s HPSEB Ltd.09-07-2014
509 115/2013
Before Hon'ble HPERC in the Matter of M/s Hul Hydro Powers (P) Limited V/s HPSEB Ltd. & Others.08-07-2014
510 20/2011
Before Hon'ble HPERC in the Matter of M/s Usaka Hydro Powers (P)Limited V/s HPSEB Ltd. & Others.05-07-2014
511 141/2013
MYT Tariff for HPSEBL for 3rd Control Period (FY2014-15 to FY2018-19)12-06-2014
512 21/2014
Multi Year Tariff For HPSEBL for Generarion Business For the Period FY-14-15 to 2018-19.10-06-2014
513 140/2013
Multi Year Tariff For HPPTCL For the Period FY-14-15 to 2018-19.10-06-2014
514 98/2014
Multi Year Tariff For HPSLDS For the Period FY-15-19.10-06-2014
515 138/2013&142/2013
Multi Year Tariff For Baspa-II HEP For FY2014-15 to 2018-19.06-06-2014
516 25/2014
Before Hon'ble HPERC in the Matter of Review of Order on Restating of Design Energy and Reconsideration of Tariff for Small Hydro Power Plants of HPSEB Limited.06-06-2014
517
Order on Fixing Rate of Free Power of Govt. of H.P to HPSEBL For FY-15.23-05-2014
518 54/10
Before Hon'ble HPERC in the Matter of Restating of Design Energy and Reconsideration of Tariff for Small Hydro Power Plants of HPSEB Limited.15-01-2014
519 57/13
Before Hon'ble HPERC in the Matter of Filing of 2nd APR of 2nd MYT Control Period (FY12-FY14), Revised Annual Revenue Requirement (ARR) for the FY 13 and revised projections for FY14 under Section 62 and 86 of the Electricity Act, 2003 - Supplementary Bills of BBMB thereof.28-12-2013
520 135/10
Before Hon'ble HPERC in the Matter of M/s Ginni Global Private Ltd. V/s HPSEB Ltd. and Others17-12-2013
521 175/09,170/10
Before Hon'ble HPERC in the Matter of M/s Nuziveedu Seed Ltd. V/s HPSEB Ltd. and Others17-12-2013
522 143/10
Before Hon'ble HPERC in the Matter of M/S Gowthami Hydro Electric Company (P) Ltd. V/s HPSEB Ltd. and Others17-12-2013
523 142/10
Before Hon'ble HPERC in the Matter of M/S Dharamshala Hydro Power Ltd. V/s HPSEB Ltd. and Others17-12-2013
524 139/10
Before Hon'ble HPERC in the Matter of M/S Him Kailash Hydro Power Pvt. Ltd V/s HPSEB Ltd. and Others17-12-2013
525 116/13
Before Hon'ble HPERC in the Matter of Sh. L.K. Mahajan, Khalini, Shimla-02 V/s HPSEB Ltd.02-12-2013
526 98/13
Before Hon'ble HPERC in the Matter of M/s Sri Rama Steels Ltd., V/s HPSEB Ltd.02-12-2013
527 88/13
Before Hon'ble HPERC in the Matter of Review Petition u/s 94(1) of the Electricity Act, read with regulation 63 of the HPERC (Conduct of Business) Regulations, 2005 for Review of Commission’s Order on True Up for FY12 and Annual Performance Review for FY-14 under the MYT Second Control Period (FY12-14) passed by the Commission on date 27.04.2013 in case No. 176/201226-11-2013
528 170/12
Before Hon'ble HPERC in the Matter of Petition for removal of difficulties on the Security Regulations, 2005,in the regulations 4 (4) for Security deposit for supply of electricity by HPSEB Ltd.19-11-2013
529 19/11
Before Hon'ble HPERC in the Matter of M/s Jaiprakash Power Ventures Ltd. V/s HPSEB Ltd.08-10-2013
530 91/13
Before Hon'ble HPERC in the Matter of Joint Petition under the provision of Section 86(1)(b) of the Electricity Act, 2003, for seeking the approval of the short/medium term “Supplementary Power Purchase Agreement (under REC Mechanism)”to be executed by the Himachal Pradesh State Electricity Board Limited with M/s Usaka Hydro Power (P) Limited in respect of Suman Sarwari Hydro Electric Project (Additional capacity of 2.5 MW from 2nd Unit).07-08-2013
531 Suo-Moto Case no. 93(A)/2013
Before Hon'ble HPERC in the Matter of HPERC (Renewable Power Purchase Obligation and its Compliance) Regulation, 201029-07-2013
532
Generic Levellised Tariff for Small Hydro Projects 20-05-2013
Category -I (Above 100 kW - 2 MW): Appendix A Sheet I-V30-11--0001
Category -I (Above 100 kW - 2 MW): Appendix A Sheet VI-VII30-11--0001
Category -II (Above 2 MW - 5 MW):Appendix B Sheet I-V30-11--0001
Category -II (Above 2 MW - 5 MW):Appendix B Sheet VI-VII30-11--0001
Category -III (Above 5 MW - 25 MW):Appendix C Sheet I-V30-11--0001
Category -III (Above 5 MW - 25 MW):Appendix C Sheet VI-VII30-11--0001
Appendix D 30-11--0001
533 172/2012
Before Hon'ble HPERC in the Matter of approval of Schedule of Service Connection Charges, containing normative rates of Infrastructure Development Charges to be recovered30-04-2013
534
True Up For FY-12 and APR for FY-14 Under 2nd MYT Period for HPSEBL.27-04-2013
535
Order on Fixing Rate of Free Power of Govt. of H.P to HPSEBL For FY-14.26-04-2013
536 171/12
Before Hon'ble HPERC in the Matter of Petition for Removal of difficulties on the Terms and Conditions for Wheeling and Retail Supply Tariff Regulations, 2011 in the Regulation 32 for Working Capital for Retail Supply Business by HPSEBL16-03-2013
537 133/11
Before Hon'ble HPERC in the Matter of The levy of additional tariff on Industrial Consumers of Baddi, Barotiwala and Nalagarh area affected by damage of transformer at Katha, Baddi on 4th August, 2009.16-02-2013
538 128/11
Before Hon'ble HPERC in the Matter of Petition under section 62 of the Electricity Act, 2003 for Annual Performance Review of FY 2012-13 during Multi Year Tariff Control Period 2011-12 to 2013-14 by HPPTCL05-01-2013
539 125/11
Before Hon'ble HPERC in the Matter of Filing of Aggregate Revenue Requirement (ARR) of State Load Despatch Centre for the MYT Control Period (FY12 – FY14) under section 32 and 86 of the Electricity Act, 200305-01-2013
540 123/11
Before Hon'ble HPERC in the Matter of HPSEB Ltd. for seeking amendment in the Himachal Pradesh Electricity Regulatory Commission (Electricity Ombudsman) Regulations, 2004 and Multi Year Tariff Order dated 19.7.201105-01-2013
541 158/12
Before Hon'ble HPERC in the Matter of Application for Review of the Order Dated 31.08.2012 passed in Petition No. 134/2012 and MA No. 101/2012 in 135/2011 for the tariff for 300 MW BASPA II Hydro Power Plant, by M/s Jaiprakash Power Ventures Ltd V/s HPSEB Ltd.29-12-2012
542 133/12
Before Hon'ble HPERC in the Matter of HPSEB Ltd. V/s M/s Jaiprakash Power Ventures Ltd., for the Clarification / Review of True Up Order dated 23rd April, 2012 in respect of truing up of tariff for sale of power from Baspa-II, 300MW HEP to HPSEBL for the First Control Period (FY09 – FY11).29-12-2012
543 105/12
Before Hon'ble HPERC in the Matter of Baddi Barotiwala Nalagarh Industries Association, Parwanoo Industries Association, Kala Amb Chamber of Commerce and Industries, Federation of Himachal Industries, V/s HPSEB Ltd. in matter of Himachal Pradesh Electricity Regulatory Commission (Conduct of Business) Regulations, 2005, for Review of the 1st APR Order for 2nd MYT Control Period dated 24th April 201227-12-2012
544 82,88,122/12
Before Hon'ble HPERC in the Matter of M/S Himachal Chamber of Commerce and Industry, M/S Kala Amb Chamber of Commerce and Industry, M/S Baddi Barotiwala Nalagarh Industries Association (BBNIA) V/s HPSEB Ltd.27-12-2012
545 155/12
Before Hon'ble HPERC in the Matter of M/S IQU Hydro Power Company Pvt Ltd V/s HPSEB Ltd.18-12-2012
546 144/12
Before Hon'ble HPERC in the Matter of M/s Mani Mahesh Hydro Power Project Coop Society Ltd. & M/s Him Kailash Hydro Power Ltd V/s HPSEB Ltd.27-11-2012
547 89/12
Before Hon'ble HPERC in the Matter of HPSEB Ltd. for Review of the True-Up Order of FY 2010-11, 1st APR Order for 2nd MYT Control Period and Tariff Order for FY 20121-13 dated 24th April 201223-10-2012
548 120/11
Before Hon'ble HPERC in the Matter of M/s Jaiprakash Power Ventures Limited, Solan (H.P.). V/s HPSEB Ltd.21-09-2012
549
First APR Order For MYT Period (FY 12-14) and Determination of Tariff for FY 13.24-04-2012
550
True Up Order for 1st MYT Control Period (FY 09-11) of Baspa-II.23-04-2012
551
Order on Fixing Rate of Free Power of Govt. of H.P to HPSEBL For FY-1223-04-2012
552 3/12
Before Hon'ble HPERC in the Matter of BBN Industries Association V/s HPSEB Ltd.03-03-2012
553 6/12
Before Hon'ble HPERC in the Matter of M/s IQU Hydro Power Co. Ltd, Kangra H.P V/s HPSEB Ltd.18-02-2012
554 7 & 8/12
Before Hon'ble HPERC in the Matter of M/s Neogal Power Co. Pvt. Ltd. and M/s Awa Power Co. Pvt. Ltd. V/s HPSEB Ltd.18-02-2012
555 127/11
Before Hon'ble HPERC in the Matter of Draft PPA Under REC Mechanism for Power Purchase on Average Pooled Cost on Short and Medium Terms07-01-2012
556 81-83/11
Before Hon'ble HPERC in the Matter of The Govt. of Himachal Pradesh V/s Himachal Small Hydro Power Association and others24-10-2011
557 224/10
Before Hon'ble HPERC in the Matter of Subsidy to be Provided by Govt. of H.P on Account of Rollback of Tariff in respect of Domestic and WIPS Categories.20-07-2011
558
Multi Year Tariff For H P State Electricity Board Ltd for FY 12 to FY 14 19-07-2011
Corrigendum30-11--0001
559 225/2010
Multi Year Tariff For Baspa-II for FY 12 to FY 1415-07-2011
560 245/2010
Multi Year Tariff For H P Power Transmission Corporation Ltd. for FY 12 to FY 1414-07-2011
561 171/2010
Order for Determination of Capital Cost of Larji HEP (126 MW) and other related issues07-07-2011
562
Order on "Pooled Power Purchase Cost" of HPSEB Ltd. for FY 2011-1214-06-2011
563 214/10
Before Hon'ble HPERC in the Matter of M/s Patikari Power Pvt. Ltd. V/s HPSEBL14-06-2011
564 11/10
Before Hon'ble HPERC in the Matter of M/s JPVL, Waknaghat Dist. Solan H.P V/s HPSEB Ltd.,GoHP (H.P)24-01-2011
565 89/10
Before Hon'ble HPERC in the Matter of Himachal Small Hydro Power Association of IPP, New shimla (H.P) V/s HPSEB Ltd., Himurja, GoHP (H.P)24-01-2011
566 28/10
Before Hon'ble HPERC in the Matter of M/s Gowthami Hydro Electric Company (P) ltd. Secunderabad V/s HPSEB Ltd., Shimla24-01-2011
567 174/10
Before Hon'ble HPERC in the Matter of M/s Tissa Power Transmission Pvt. Ltd., Shimla, H.P V/s HPSEB Ltd., Shimla, (H.P)22-01-2011
568 81/10
Before Hon'ble HPERC in the Matter of M/s Astha Project India Ltd. (HP) V/s HPSEB Ltd., Shimla23-11-2010
569 210/09
Before Hon'ble HPERC in the Matter of M/s Jai Bharat Steel industries, Sirmour (HP) V/s HPSEB Ltd., Shimla28-08-2010
570 Suo-motu Case No. 148/10
Before Hon'ble HPERC in the Matter of Violation of regulation 3(4) (a)(ii) and 3(6) of the HPERC (Guidelines for The Establishment of Forum for the Redressal of Grievances of Consumers), Regulation,200328-08-2010
571 51/10
Before Hon'ble HPERC in the Matter of M/s India Steel, Sirmour (HP) V/s HPSEB Ltd., Shimla and Others23-08-2010
572 7/10
Before Hon'ble HPERC in the Matter of M/s A.T Hydro Pvt. Ltd., New Delhi V/s HPSEB Ltd., Shimla and Others23-08-2010
573 8/10
Before Hon'ble HPERC in the Matter of M/s Cimron Construction Pvt. Ltd. V/s HPSEB Ltd., Shimla and Others23-08-2010
574 82/09
Before Hon'ble HPERC in the Matter of M/s Valley Iron and Steel Co Ltd., Sirmour (HP) V/s HPSEB Ltd., Shimla23-08-2010
575 16/10
Before Hon'ble HPERC in the Matter of M/s Batot Hydro Power, Mumbai, M/s Jala Shakti Ltd.,H.P, M/s belij Hydro power ltd.(AP),M/s Almi Hydro,Mumbai, M/s Brahi Hydro, Mumbai, M/s Gehra Hydro,(AP) V/s HPSEB Ltd and HPPTCL, Shimla20-08-2010
576 193/09
Before Hon'ble HPERC in the Matter of M/s Regent Energy Ltd., New Delhi V/s HPSEB Ltd and Others20-08-2010
577 184/09
Before Hon'ble HPERC in the Matter of M/s Astha Projects (india) Ltd., New Delhi V/s HPSEB Ltd and Others20-08-2010
578 183/09
Before Hon'ble HPERC in the Matter of M/s Sri Sai Krishna Hydro Energies Pvt. Ltd., Hydrabad (AP) V/s HPSEB Ltd and Others20-08-2010
579 83/10
Before Hon'ble HPERC in the Matter of M/s Sai Engineering foundation Shimla, M/s Tangling Mini Hydal Power Project, Shimla V/s HPSEB Ltd., HPPTCL and Others31-07-2010
580 85/10
Before Hon'ble HPERC in the Matter of HPSEB Ltd., Shimla V/s Small Hydro Power Projects and Others31-07-2010
581 32/10
Before Hon'ble HPERC in the Matter of H.P Power Transmission Corporation Ltd., Shimla for the Grant of Transmission Licence in the State of H.P31-07-2010
582 Suo-Motto
Order on Amendment of Model PPA of Small Hydro Power Project up to 5 MW26-07-2010
583 138/2010
Before Hon'ble HPERC in the Matter Himachal Pradesh Power Corporation Ltd V/s HPSEB14-07-2010
584 194/2009
Consequential Order to give effect to Subsidy in the Tariff for FY 2011 of Control Period FY 09 -1125-06-2010
585 91/09, 168/09, 176/09 & 179/09
Before Hon'ble HPERC in the Matter HPSEB V/s Jai Prakash Hydro power Limited, Distt. Solan23-06-2010
586 194/2009
Determination of Tariff for FY 2011 of Control Period FY 09 -1110-06-2010
587 43/08 &209/009
Before Hon'ble HPERC in the Matter M/s Harisons Hydel Construction Co (P) Ltd, Distt. Kullu (H.P.) V/s HPSEB, H.P Govt and HIMURJA10-06-2010
588 53/08 & 5/10
Before Hon'ble HPERC in the Matter M/s Him Kailash Hydro Power Pvt. Ltd, Andhra Pradesh V/s HPSEB, H.P Govt and HIMURJA08-06-2010
589 5/09 &212/09
Before Hon'ble HPERC in the Matter M/S Mangalam Energy Development Co. Pvt. Ltd, New Delhi V/s HPSEB, H.P Govt and HIMURJA08-06-2010
590
Order on Fixing Rate of Sale of Free Power of GoHP to HPSEB Ltd. for FY1107-06-2010
591 97/08 & 208/09
Before Hon'ble HPERC in the Matter M/s Dharamshala Hydro Power Ltd, Hyderabad V/s HPSEB, H.P Govt and HIMURJA05-06-2010
592 267/08 &206/09
Before Hon'ble HPERC in the Matter M/s Ascent Hydro Projects Ltd, Mumbai V/s HPSEB, H.P Govt and HIMURJA22-05-2010
593 62/08 & 207/09
Before Hon'ble HPERC in the Matter M/s Astha Projects (I) Pvt. Ltd New Delhi V/s HPSEB, H.P Govt and HIMURJA22-05-2010
594 70/08 & 202/09
Before Hon'ble HPERC in the Matter M/s Ginni Global Private Ltd, New Delhi V/s HPSEB, H.P Govt and HIMURJA22-05-2010
595 11/08
Before Hon'ble HPERC in the Matter M/s DSL Hydrowatt Limited,Industrial Area Baddi, Distt. Solan (H.P.) V/s HPSEB, H.P Govt and HIMURJA13-05-2010
596 173 / 08
Before Hon'ble HPERC in the matter Subsidy to be provided by the Govt. of H.P on account of rollack of Tariff in respect of Domestic & WIPS categories in the HPSEB schedule of Tariff, 2009 approved in the First Annual Performance review Order for MYT Period (FY09-11), in accordance with Section 65 of EA,2003- Issue of Consequential Orders V/s HPSEB20-02-2010
597
Supplementary Orders on Small Hydro Projects up to 5 MW Tariff and other related issues.10-02-2010
598
Orders on Implementation of APTEL Judgement in Apeal No. 50/2008 and 65/2008 in respect of SHP up to 5 MW09-02-2010
599 92 / 2009
Before Hon'ble HPERC in the Matter M/s Batot Hydro Power Ltd. and Others V/s HPSEB and HPPCL21-12-2009
600 151 / 04
Before Hon'ble HPERC in the Matter M/s Uttaranchal Jal Vidyut Nigam Ltd. Dehradun. Dehradun.V/s HPSEB, UPCL and UPJVNL11-12-2009
601 115 / 09
Before Hon'ble HPERC in the Matter of M/S Kapil Mohan & Associates Hydro Power Private Ltd.,Solan H.P V/s HPSEB and HPPTCL, Shimla11-12-2009
602 136 / 09
Before Hon'ble HPERC in the Matter M/S Vamshi Hydro Energies Private Ltd.,Hyderabad (A.P) V/s HPSEB and Other10-12-2009
603
HPERC Determination of Open Access Charges Order. 200925-11-2009
604 11/08, 20/2008, 21/2008, 43/08, 53/08,62/2008, 70/
Before Hon'ble HPERC in the Matter of M/S DSL Hydrowatt Limited, Baddi, Solan, M/S Jala Shakti Limited, Banjara Hills, Hyderabad, M/S Harison Hydel Construction Co (P) Ltd , Kullu (H.P.), M/S Him Kailash Hydro Power Pvt. Ltd, Andhra Pradesh, M/s Astha Projects (I) Pvt. Ltd., New Delhi, M/S Ginni Global Ltd, New Delhi, M/S Dharamshala Hydro Power Ltd, Hyderabad, M/S Virender Dogra Power Projects (P) Ltd, Pathankot (Punjab), M/S Patikari Power Pvt. Ltd, Shimla, M/S Ascent Hydro Projects Ltd, Mumba29-10-2009
605 124 / 09
Before Hon'ble HPERC in the Matter of Compliance of direction No. 9.4.19 contained in Tariff Order for HPSEB for FY 2004-05 to review the justification for 400 kV Transmission Line from Nalagarh to Kunihar and 400 kV Sub-station at Kunihar. 16-10-2009
606 101/09
Before Hon'ble HPERC in the Matter of Removal of Difficulties in the Implementation of the Direction No.9.4.14.2 (Employee Cost) of the Tariff Order for 2004-05., HPSEB Shimla 16-09-2009
607 46/08
Before Hon'ble HPERC in the Matter of M/S Himalayan International Ltd., Poanta Sahib, Sirmaur (H.P) V/s HPSEB 16-09-2009
608 83/2009
Before Hon'ble HPERC in the Matter of M/s Jaiprakash Hydro Power Limited, Waknaghat, Solan (H.P) V/s HPSEB 10-09-2009
609 149/2009
Before Hon'ble HPERC in the Matter of M/S B.B.N. Industries Association, Industrial Area, Baddi, Solan (H.P) V/s HPSEB 29-08-2009
610 85/2009
Before Hon'ble HPERC in the Matter of M/S Sri Rama Steels Ltd., Bated Barotiwala, Distt. Solan V/s HPSEB 29-08-2009
611 250/08
Determination of Tariff for FY 2010 of Control Period FY 09 -1124-08-2009
612
Order on Fixing the Rate of Sale of Free Power of GoHP to H.P State Electricity Board For FY 2010.21-08-2009
613 175/08
Before Hon'ble HPERC in the Matter of Approval for Supply of Power to Power intensive Units in Himachal Pradesh. 11-08-2009
614 255/07
Before Hon'ble HPERC in the matter of Compliance of direction No. 9.4.19 contained in Tariff Order for HPSEB for FY 2004-05 to review the justification for 400 kV transmission line from Nalagarh to Kunihar and 400 kV Sub-station at Kunihar and HPSEB.25-05-2009
615 138/07
Before Hon'ble HPERC in the matter of HPSEB V/s Irrigation and Public Health Department, Govt. of Himachal Pradesh23-05-2009
616 48/09
Before Hon'ble HPERC in the matter of Removal of Difficulties In HPERC (Recovery of Expenditure For Supply of Electricity) Regulation 2005.16-05-2009
617 265/08 & 59/09
Before Hon'ble HPERC in the matter of Contravention of HPERC (Distribution Licensee's Standarad of Performance) Regulation 2005, Issued on 3rd November 2005 Under Section 181, Read with Section 57, 58, 59 and 86 of Electricity Act 2003.30-04-2009
618 256/07
Determination of Multi year Tariff for Baspa II HEP For FY 2009-1130-03-2009
619 23/09
Before Hon'ble HPERC in the matter of Suo Mottu Notice to Chief Engineer (Trans.) Hamirpur16-03-2009
620 27/09
Before Hon'ble HPERC in the matter of Suo Mottu Notice to Director HIMURJA Shimla16-03-2009
621 26/09
Before Hon'ble HPERC in the matter Suo Mottu Notice to Chief Engineer (Op South) HPSEB Shimla 16-03-2009
622 25/09
Before Hon'ble HPERC in the matter of Suo Mottu Notice to Chief Engineer (S) HPSEB Shimla 16-03-2009
623 24/09
Before Hon'ble HPERC in the matter of Suo Mottu Notice to Chief Engineer (PSP) HPSEB Shimla16-03-2009
624 279/08
Before Hon'ble HPERC in the matter of Amendment In Model PPA (Approved in Case No. 2 / 2002) For SHEP Up To 5 MW Including 5 MW Capacity Being Executed By IPP in Private Sector in the State of Himachal Pradesh06-03-2009
625 205/08
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Padmavati Steels Ltd., Village johron, kala Amb , Distt. Sirmour24-02-2009
626 212/08
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Rama Steels Ltd., Barotiwala, Distt. Solan24-02-2009
627 211/08
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Chandigarh Iron & Steels Company Ltd., Barotiwala, Distt. Solan24-02-2009
628 44/08
Before Hon'ble HPERC in the matter of M/s A. Power Himalayas Ltd., Paonta Sahib, Sirmour V/s HPSEB23-01-2009
629 174/08
Before Hon'ble HPERC in the matter of M/s Dharamshala Hydro power Ltd., Hyderabad V/s HPSEB23-01-2009
630 156/08
Before Hon'ble HPERC in the matter of M/s Jaiswal Metals Pvt. Ltd.,Kala Amb, Sirmour V/s HPSEB23-01-2009
631 150/08
Before Hon'ble HPERC in the matter of M/s A.T. Hydro Power Ltd., Hyderabad and m/s Cimaron Constructions Pvt. Ltd., Hyderabad and Traila Power Ltd. Hyderabad V/s HPSEB23-01-2009
632 200/08
Before Hon'ble HPERC in the matter of M/s Kapil Mohan & Associate Hydro power (P) Ltd. Chandigarh V/s HPSEB23-01-2009
633 239/07
Before Hon'ble HPERC in the matter of Delay in Completion and Cost Escalation of HPSEB Khauli (12 MW) Hydro Project in Kangra District.16-09-2008
634 120/2008
Before Hon'ble HPERC in the matter of Petition under clause (f) of sub-section of section 94 of the Elctricity Act 2003 for the Review of order dated 5-4-2008 passed in Suo-Moto case no 49/2007 imposing penalties for non- compliance/ contravention of HPERC (Distribution Licence's Standard of Performance) Regulation, 2005 issued on 3rd Nov. 2003 under section 181.02-09-2008
635 260/07
Before Hon'ble HPERC in the matter of M/s Morepan Laborateries Ltd Parwanoo V/s HPSEB30-08-2008
636 262/07
Before Hon'ble HPERC in the matter of M/s Morepan Laborateries Ltd Parwanoo V/s HPSEB30-08-2008
637 274/07
Before Hon'ble HPERC in the matter of M/ s Rama Steel Ltd. Barotiwala, Solan V/s HPSEB30-08-2008
638 273/07
Before Hon'ble HPERC in the matter of M/s Chandigarh Iron And Steel Company Pvt. Ltd Barotiwala, Solan V/s HPSEB30-08-2008
639 219/07
Before Hon'ble HPERC in the matter of M/s Padmavati Steel Ltd. Kala Amb Sirmaur V/s HPSEB22-08-2008
640 115/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Chirchind Hydro Power Ltd. situated in District Chamba.( H.P), in respect of Chirchind 5.0 MW Capacity.31-05-2008
641 110/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Chirchind Hydro Power Ltd. situated in District Chamba.( H.P), in respect of Kurehed 4.5 MW Capacity.31-05-2008
642 109/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Himaachal Hydel Projects (P) Ltd. situated in District Chamba.( H.P), in respect of Tulang 3.0 MW Capacity.31-05-2008
643 108/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Trident Power Systems Ltd. situated in District Mandi.( H.P), in respect of Lower - Uhl 5.0 MW Capacity. 31-05-2008
644 107/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Traila Power Ltd. situated in Chamba.( H.P), in respect of Traila -III 5.0 MW Capacity. 31-05-2008
645 96/08
Before Hon'ble HPERC in the matter of Approval of PPA to be executed by HPSEB with M/s Watermillers Power Company (P) Ltd. situated in District Kullu. ( H.P), in respect of Chhor 1.0 MW Capacity. 31-05-2008
646
MYT- Tariff Order for FY 2009-2011 30-05-2008
Annexures30-11--0001
647 242/06
Before Hon'ble HPERC in the matter of M/s. Himalaya International Ltd. V/s HPSEB.24-05-2008
648 79,80,81,81,83/07
Before Hon'ble HPERC in the matter for filling up of Propsed Tariff for Financial Year 2005-06 to 2008-09 for Chibro, Dhakrani,Khodri, Dhalipur, Kulhal, V/s. HPSEB & Others07-05-2008
649 86/08
Before Hon'ble HPERC in the matter of M/s. Jwalaji Alloy Pvt. Ltd. Jasoor, Kangra V/s HPSEB.03-05-2008
650 175/07
Before Hon'ble HPERC in the matter of M/s. Time Technoplast Ltd. Baddi, Solan V/s HPSEB.30-04-2008
651 146/04
Before Hon'ble HPERC in the matter of Sh. Bishan Chauhan of Cemetry Road Sanjauli, Shimla V/s HPSEB.30-04-2008
652 109/04
Before Hon'ble HPERC in the matter of M/s. Emm Tex Synthetics Ltd. Nalagarh Solan V/s HPSEB.30-04-2008
653 89/05
Before Hon'ble HPERC in the matter of Mehatpur Industries Association, Una V/s HPSEB.30-04-2008
654 32/07
Before Hon'ble HPERC in the matter of M/s. Coral Health Crae Pvt.Ltd. Parwanoo V/s HPSEB.30-04-2008
655 246/06
True Up Order For Tariff Order of FY 2006-2007.29-04-2008
656 98/06
Before Hon'ble HPERC in the matter of M/s.A.T Hydro Pvt. Ltd. V/s HPSEB.15-03-2008
657 97/06
Before Hon'ble HPERC in the matter of M/s. Cimaron Construction Pvt. Ltd. V/s HPSEB.15-03-2008
658 196/05
Before Hon'ble HPERC in the matter of M/s. Claridge Moulded Fibre Ltd. V/s HPSEB.15-03-2008
659 242,243/06
Before Hon'ble HPERC in the matter of M/s. Himalaya International Ltd. Subh Khera, Paonta, Distt. Sirmour V/s HPSEB and Others.07-03-2008
660 139/07
Before Hon'ble HPERC in the matter of M/s. Sai Engineering Foundation New shimla V/s HPSEB Shimla and Others.25-02-2008
661 75/07 & 94/07
Before Hon'ble HPERC in the matter of M/s. Jaiprakash Hydro Power ltd. Waknaghat, Solan V/s HPSEB Shimla .07-02-2008
662 160/06
Order on Review Petition in Respect of ARR(Annual Revenue Requirement) for 2006-2007.30-01-2008
663 230/07
Before Hon'ble HPERC in the matter of M/s Auro Spinning Mills Baddi, Solan V/s HPSEB.04-01-2008
664 135/07
Before Hon'ble HPERC in the matter of M/s H.M Steel Kala Amb, Sirmour, M/s J.B Rolling Mills (P) Ltd, Kala Amb, Sirmour, M/s Sri Rama Steel Ltd,Barotiwala Distt. Solan V/s HPSEB.04-01-2008
665
Commission's Order on Small Hydro Power Projects - Tariff & Others Issues.18-12-2007
666 213/07
With Regard to the Compliance of Direction issued in Tariff order for Year 2001-02 and further upheld by the APTEL Vide Appeal No. 21/7.15-12-2007
667 245/07
Before Hon'ble HPERC in the matter of M/s Deluxe Enterprises, Nalagarh, Solan V/s HPSEB15-12-2007
668 118/07
Before Hon'ble HPERC in the matter of M/s Auro Spinning Mills Baddi, Solan V/s Secretary (Power) H.P Govt & Others01-12-2007
669 168/07
Before Hon'ble HPERC in the matter of M/s Himachal Aquaculture Farms UNA(Gagret), V/s HPSEB and Others17-11-2007
670 149/07
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Amar Roller Flour Mills Parwanoo, Solan.17-11-2007
671 117/07
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Ambuja Cements Ltd. Darlaghat, Solan.19-10-2007
672 92/07
Before Hon'ble HPERC in the matter of HPSEB V/s M/s Gujrat Ambuja Cements Ltd. Darlaghat, Solan.19-10-2007
673 173/06,113/07 (Review)
Before Hon'ble HPERC in the matter of HPSEB V/s M/s H.M. Steel Ltd. Kala Amb25-08-2007
674 93/07
Before Hon'ble HPERC in the matter of HPERC (Guidelines for establishment of Forum for redressal of grievances of Consumers) regulation 2003- notice under section 142 of Electricity Act 2003.25-08-2007
675 Suo Motu Case No. 20/07
Hon'ble HPERC in matter of President Mehatpur Industries association V/s HPSEB04-08-2007
676 Execution Petition No. 136/07
Before Hon'ble HPERC in matter of M/s H.M. Steels Ltd. V/s HPSEB16-06-2007
677 91/07
Before Hon'ble HPERC in matter of HPSEB V/s M/s Super Plateck Ltd.26-05-2007
678 180/ 2006
Before Hon'ble HPERC in matter Government of Himachal Pradesh (IP&H Deptt.) V/s HPSEB, Shimla26-05-2007
679
Tariff Order for FY 2007-08 16-04-2007
Annexures30-11--0001
680 173/06
Before Hon'ble HPERC in matter of M/s H.M. Steel V/s HPSEB30-03-2007
681 255/06
Before the Hon’ble HPERC in the matter of M/S Himalya Vege Fruits Ltd v/s HPSEB24-03-2007
682 250/06
Before the Hon’ble HPERC in the matter of M/S Chlorates v/s HPSEB24-03-2007
683 242 & 243/06
Before the Hon’ble HPERC in the matter of M/S Himalya International Ltd v/s HPSEB24-03-2007
684 338/05
HPERC ORDER-1 OF 2007 (Order regarding prior approval of investments)24-02-2007
685 Review No. 214/06 in 181/04
Before Hon'ble HPERC in matter of HPSEB v/s M/s Amba Metals Ltd, M/s J.B Rolling Mills (P) Ltd, M/s H.M Steel Ltd, Kala Amb and Others17-01-2007
686 181/04
Before the Hon’ble HPERC in the matter of HPSEB Vs BBN Industries Association and others17-01-2007
687 4/2006
Before the Hon’ble HPERC in the matter of HPSEB Vs M/s Rupana Paper Mills (P) Ltd.17-01-2007
688
Interim Order on compliance of directions on Tariff Order06-01-2007
689 205/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla M/s Sri Rama Steels Ltd. v/s HPSEB 25-11-2006
690 345/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of regarding submission of status report on implementation of directions-cum-advisories given to the HPSEB 18-11-2006
691 338/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of M/s JP Hydro Power Ltd. v/s HPSEB18-11-2006
692 338/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of M/s Jayprakash Hydro Power Ltd. v/s HPSEB28-10-2006
693 182/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of subsidy to be provided by the Govt. of HP13-10-2006
694 28/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of UJVNL v/s HPSEB16-09-2006
695 338/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in M/s Jayprakash Hydro Power Ltd. v/s HPSEB08-09-2006
696 179/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of M/s Sri Rama Steels v/s HPSEB09-08-2006
697 317/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla sou- moto notice to HPSEB09-08-2006
698 358/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla sou- moto notice to HPSEB09-08-2006
699 303/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla sou- moto notice to HPSEB09-08-2006
700
Tariff order for FY 2006-0703-07-2006
701 334/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter Contravention of HPERC (Recovery of expenditure for supply of electricity) Regulations 200517-06-2006
702 28/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter dispute between UJVNL & HPSEB17-06-2006
703 268/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter Parwanoo Industries Association and M/s Confederation of Indian Industary v/s HPSEB17-06-2006
704 04/2006
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter M/s Rupana Paper Mills (p) Ltd. v/s HPSEB17-06-2006
705 359/05
Before the Hon’ble HP Electricity Regulatory Commission at Shimla M/s Ashoka Alloys v/s HPSEB22-04-2006
706 23/06
Before the Hon’ble HP Electricity Regulatory Commission at Shimla in the matter of HPSEB review of impugned order of 04-01-200622-04-2006
707 197/04
Before the Hon’ble HP Electricity Regulatory Commission at Shimla Sou Mottu show cause notice to HPSEB22-04-2006
708 303/05
Before the Hon'ble HPERC at Shimla Order on Security Deposit Regulations 200509-12-2005
709 334/05
Before the Hon'ble HPERC at Shimla Order on Recovery of expenditure for supply of electricity Regulation 200509-12-2005
710 315/05
Before the Hon'ble HPERC at Shimla Order on Clarification on Recovery of Expenditure 31-10-2005
711
Tariff order for FY 2005-06 06-05-2005
Corrigenda to the Tariff Order 2005-0629-06-2005
712 34/2003
In the matter of Complaint Handling Mechanism and Procedure notified by the Commission vide its Order No. HPERC/010/2002 dated 8th Feb., 200312-12-2003
713 Suo Motu 1-7/2003
In the matter of Tariff Order dated 29-10-2001 for the determination of Annual Revenue Requirement, Transmission & Bulk Supply Tariff and Distribution & Retail Supply Tariff for the Financial Year 2001-2002 and Contravention of Directions thereof18-10-2003
714 8-15/2003
In the matter of Execution of the Power Purchase Agreement by HPSEB with M/s Veecon IPA Gastechnik Ltd,M/s Astha Projects,M/s DLI Power (India) Pvt. Ltd & others26-09-2003
715 17/2003
In the matter of A.J.Singh, Headmaster, Pinegrove School Kasauli Road, Dharampur V/s HPSEB Shimla02-07-2003
716 186/02
In the matter of Filing of Petition for the approval of wheeling charges being levied on account of transmission of power within the State from Malana Hydro Electric Project in Kullu District of Himachal Pradesh27-08-2002
717 191/02
In the matter of Inox Air Products Ltd, Barotiwala V/s Himachal Pradesh State Electricity Board27-08-2002
718 07-13/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on March 23, 2002 for contravention of direction No. 7.13 of Tariff order dated October 29, 200117-08-2002
719 14-20/2002
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on March 26,2002 for contravention of direction No.7.28 of Tariff Order dated October 29, 200117-08-2002
720 21-27/2002
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on 27th March, 2002 for contravention of direction No. 7.31 of Tariff Order dated October 29, 200117-08-2002
721 28-34/2002
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on March 30, 2002 for contravention of direction No. 7.14 of Tariff order dated October 29, 200117-08-2002
722 35-41/2002
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on March 30, 2002 for contravention of direction No. 7.9 & 7.10 of Tariff order dated October 29, 200117-08-2002
723 77-83/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on April 30,2002 for contravention of direction No.7.5 of Tariff Order dated October 29, 200117-08-2002
724 84-90/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on April 30,2002 for contravention of direction No.7.11 of Tariff Order dated October 29, 200117-08-2002
725 91-97/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on April 30, 2002 for contravention of direction No.7.4 of Tariff Order dated October 29, 200117-08-2002
726 100-106/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on May 15,2002 for contravention of direction No.7.18 of Tariff Order dated October 29, 200117-08-2002
727 107-113/02
Suo moto notice under Section 45 of the Electricity Regulatory Commissions Act, 1998 (14 of 1998) issued on May 15, 2002 for contravention of direction No.7.26 of Tariff Order dated October 29, 200117-08-2002
728 192/2002
In matter of Filing of Petition for approval of Energy Banking Arrangement already entered into by HPSEB with other State Electricity Boards/Electric Utilities14-08-2002
729 03/02
In the matter of Parwanoo Industries Association (PIA) V/s Himachal Pradesh State Electricity Board, Complaint under Clauses 12 & 27 (xvi) falling under Chapter-IV of Himachal Pradesh Electricity Regulatory Commission, (Conduct of Business) Regulations, 200103-08-2002
730 Misc. Comp. 99/02
In the matter of M/s Gujarat Ambuja Cements Limited (GACL) V/s HPSEB03-08-2002
731
Tariff order for FY 2004-0529-05-2002
732 03/2001
IN THE MATTER OF “APPROVAL OF ESCROW ARRANGEMENT BETWEEN HPSEB AND POWER TRADING CORPORATION, INDEPENDENT POWER PRODUCERS/ANY OTHER POWER PRODUCER” HELD ON 29-1-200229-01-2002
733 01/02
In the matter of PHD Chamber of Commerce & Industry V/s Himachal Pradesh State Electricity Board ,Complaint under clause 12 & 27 (xvi) failing under chapter IV of HPERC (Conduct of Business) Regulations 2001 &19-01-2002
734
Tariff order for FY 2001-0203-05-2001
735
30-11--0001
736
30-11--0001